Filter Results

1101 to 1125 of 7765
vm2017annreport
feet; proposed alley vacation petitions; and proposed street use term permits for ...
0.00184079376 |
a/77920
sdot
and weather response activities;•Street use permitting and inspection functions;•American ...
0.0018407543 |
a/165379
masterplanannualreport-2013
of Planning and Development (DPD) approved Children’s Master Use Permit (MUP) for Phase 1 of the Project ...
0.00184074359 |
a/77107
rpzbrochureapril2009
recommendati ons• Limit permits per household address to equitably manage supply and demand of on-street ...
0.00184063846 |
a/103629
2022_2024_pmp_implemplan_v8_appendices
in more locations, continued encouraging new active uses of streets through permitting ...
0.0018405976 |
a/139489
sepachecklistmeadowbrookpondrehabilitation010918
) • Street Use Permit—SDOT • Hydraulic Project Approval (HPA)—Washington Department of ...
0.00184059551 |
a/115447
street use permit process secondary reviewer training - ...
street use permit process secondary reviewer training - powerpoint presentation
0.00184059 |
a/137772
street use permit amendments external workshop_110520
street use permit amendments external workshop_110520
0.00184059 |
a/105758
greenlakevmp
26 Evaluation 27 Opportunities: 27 Issues and Constraints: 27 VEGETATION - RELATED PARK USES BASIC PARK ...
0.00184058037 |
a/92732
transportation
In recognition of the significant street surface repair needs throughout the city, funding is increased for the Arterial ...
0.00184057618 |
a/61924
appendixd
provided, to promptly permit entry therein by the Planning Director, Fire Marshal, City Health Officer or the Building ...
0.00184055639 |
a/87491
neighborhoodsanddevelopment
; - Seattle Tree Protection Ordinance; - State Environmental Policy Act (SEPA); and - Storm water Code. DPD reviews land ...
0.00184030749 |
a/61894
seattledesigncommission-2003.08.07sandpoint-magnusonparkminutes
location options for the plaza space including the possibility of using the street as part of the plaza; ƒ ...
0.00184029574 |
a/85320
sepa checklist south recycling and disposal station 010319
) • Administrative Conditional Use Permit • Master Use Permit, Type II ...
0.00184027082 |
a/115433
annual report 2018 -- 5-2-19 - final
on the plan and guidelines. 13 Concept Streetscape Design Plan for Each Street Frontage Containing Pocket Parks. Prior to ...
0.00184014521 |
a/77363
jacksonhubmeeting2summary
and south ends of Downtown and we would like to see if there are opportunities to pair a new development or project with ...
0.00184009515 |
a/87183
sacfinalreportandrecommendations-2006-09
: • Recommendation to require a formal evaluation process prior to any decision to construct student housing on campus - Prior to ...
0.00184004754 |
a/77334
neighborhoods
; - Seattle Tree Protection Ordinance; - State Environmental Policy Act (SEPA); and - Stormwater Code. DPD reviews land ...
0.00184000435 |
a/61852
mimp_annual_report_fy2013-2015_2015_10_01
Building along E Madison Street. When the university moves forward with a Master Use ...
0.00183999271 |
a/77261
transportation
maintains Seattle's 1,581 lane miles of arterial streets through resurfacing and reconstruction projects. The Department ...
0.00183997641 |
a/61982
249transportation
VillageThe Arterial Asphalt and Concrete Program maintains Seattle's 1,581 lane miles of arterial streets through ...
0.00183997641 |
a/61971
ch_mimp_2022 annual report_final
design is consistent with the requirements as required by SDOT. Page 8 of 35 13 Concept Streetscape Design Plan for Each ...
0.00183996535 |
a/139530
stuse_pavementrestorationcontractorapplicationpacket
Service Connections New utility service connections usually involve restoration of roadway pavement. ANY work in the right of way requires ...
0.00183994055 |
a/104749
2009attachmentb-programevaluationandotheractivitiesnarrative
right to capture rain water for storage of rainwater. The City applied for and received a water right permit from Ecology ...
0.00183992914 |
a/113429
transportation
Seattle's 1,581 lane miles of arterial streets through resurfacing and reconstruction projects. The Department ...
0.00183992169 |
a/61992