Filter Results

431 to 440 of 2913
4183-environental-0987-014-piesa-f1
.................................................................................................................. 17 15.0 STATEMENT OF THE  ...
0.00180439325 |
a/59319
slis
, in collaboration with the Office of the Waterfront, submit a report on planning for the use of the Battery Street surface ...
0.00180433446 |
a/63158
seattledesigncommission-2017.11.16wsccexpansiondraftpresentation
Open Spaces & R.O.W. Improvements• Historic Building Lighting• Additional Improvements Beyond CodePublic Benefit Art ...
0.00180430315 |
a/86138
lakecitydraftudf
Comprehensive Plan, and local neighborhood plans. Contract rezones also typically include concept ...
0.00180420675 |
a/86235
20180718_beershevafinaldesignreport
and commercial core that connects Rainier Beach Link Station to the shores of Lake Washington. The existing Rainier Beach Neighborhood ...
0.00180418172 |
a/92972
sepachecklist-sewerlining21-2
to the sun for adjacent properties. c. What kinds of energy conservation features are included in the plans of this ...
0.00180417229 |
a/128671
sdot2007annualreportfinal
Eastbound Off-Ramp was completed early in 2007. Several of the recommendations were incorporated into plans for the ...
0.00180407346 |
a/99441
adoptedufcmeetingnotes082422
acknowledgement. Public comment: Michael Oxman noted the similarities in the letter the UFC sent on the Comp Plan ...
0.00180406147 |
a/134740
seattledesigncommission-2002.11.21montlakelibraryminutes
seattledesigncommission-2002.11.21montlakelibraryminutes MINUTES OF THE MEETING 21 November 2002 Projects Reviewed Convened: 8:30am ...
0.001804048 |
a/85305
udistrictrezoneordinance
will open a light rail station at NE 43rd Street and Brooklyn Avenue 17 NE in 2021, and the City’s Comprehensive Plan ...
0.0018039695 |
a/87846