Filter Results

1001 to 1025 of 1292
4-0commentsampresponsesfeis2016_0505
, and certainly at the urban village level such that the acknowledged "localized impacts" are glossed over. These could be significant ...
0.00218256819 |
a/87480
seattlecpfeisnoappendices2016_0505
, such as persistent sewer backups or flooding in some areas which would certainly be exacerbated by additional ...
0.00218256819 |
a/87658
uw-culturalresourcesreport_finaldeliverable_august-2017
another. Lake Washington’s water levels had always varied due to run-off from tributaries, but flood controls were put in ...
0.00218256819 |
a/76616
pspb100522westlandpp
Recessed Steplight: Targetti–ZedgeLine3000k CCT -BlackRecessed steplightsin concrete planter walls7S12A Surface Mounted Lights: ...
0.00218256819 |
a/134388
2024 wmbe annual report
* Purchasing Consultant 35% 30% 25% 20% 15% 10% 5% 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ...
0.00218256819 |
a/172299
1-draft_beps_ordinance_06.05.23
rise, and flooding; and 20 WHEREAS, the buildings account for thirty-seven percent of the City’s core greenhouse gas 21 ...
0.00218256819 |
a/143297
fap_communityleaderinterviews_2022
that supports healthy, vibrant communities and advances race and social justice efforts. Work to update the Plan first started in September ...
0.00218256819 |
a/131449
cdwac_notes_20190226
Kathy Curry has left role of WSAC LOB Liaison. She will be at March WSAC Meeting and will be transitioning Melissa Levo into serving in the ...
0.00218132813 |
a/111090
2 - october 2022 loc meeting handout
will complete the project definition phase for all bridges in 2019. Following this, SDOT will prioritize and scale seismic ...
0.00218132813 |
a/134784
wsacjan10,2018meetingagenda
Curry, WSAC Liaison, & Members 15 5:50— 6:05 Presentation & Discussion 3. Water Supply Update - Part 1: Winter Flood ...
0.00218132813 |
a/115735
wsacjan10,2018meetingagenda
Curry, WSAC Liaison, & Members 15 5:50— 6:05 Presentation & Discussion 3. Water Supply Update - Part 1: Winter Flood ...
0.00218132813 |
a/112032
seattle-light-and-power-2012-audited-financial-statements
. Hydroelectric operations also are influenced by flood control and environmental matters, including protection of fish. In ...
0.00218132813 |
a/58534
seattle-light-and-power-2012-audited-financial-statements
. Hydroelectric operations also are influenced by flood control and environmental matters, including protection of fish. In ...
0.00218132813 |
a/107396
gnd_top_10_actions_report
and sweltering summer heats, droughts and flooding, wildfire smoke and dangerous air quality, the list goes on. With the ...
0.00218132813 |
a/131594
adoptedufcmeetingnotes111820
of Seattle’s urban forest has had its chance, but it is not working. • In 2019, the Council passed Resolution 31902 ...
0.00218132813 |
a/119048
dwf-2017-moodys-report
allows the utility to pass through countywastewater treatment charges based on adopted wholesale rates and projected bill consumption. The ...
0.00218132813 |
a/58405
2017_sewer_drain_liner_checklist
, 2019 5.Agency requesting checklist:Seattle Public Utilities (SPU) 6.Proposed timing or schedule (including phasing, if ...
0.00218132813 |
a/112717
sdot
by keeping harmful pollutants from reaching waterways and keeping storm drains clear to reduce flooding. Every day ...
0.00218132813 |
a/62791
delridgeoct8meetingboards
– Lead Localize Flooding Control Program  SPU Localized Flood Control Program  Report drainage issues ...
0.00218132813 |
a/86693
2023-07-25 organizational development 101 meeting slides
), Pike Place Market (1973), SciPDA (1975),4Culture (est 2003 - King County), Central District Community Preservationand Development ...
0.00218132813 |
a/147353
oneseattleplandeisproposalandalternatives
and results. See Exhibit 2.1-2. A subarea is reviewed in greater detail at the 130th and 145th Station Area as a result of a station area ...
0.00218132813 |
a/153563
oneseattleplanfeis-chapter02-proposalandalternatives
Station Area as a result of a station area planning process ongoing since 2019. See Exhibit 2.1-3. Ch.2 Proposal & ...
0.00218132813 |
a/165712
draftintegratedplan
monitoring will occur between 2016 and 2019. Volume 3 Final Integrated Plan May 29, 2015 Integrated Plan Summary ...
0.00218132813 |
a/114837
draftintegratedplan
between 2016 and 2019. Volume 3 Final Integrated Plan May 29, 2015 Integrated Plan Summary Summary - 6 The ...
0.00218132813 |
a/112866
draftlongtermcontrolplan
at designed relief points in order to avoid sewage flooding in streets and backups into homes and businesses. These ...
0.00218132813 |
a/112867