You just searched for:
Search
Filter Results
76 to 100 of 1154
sdotcap
https://www.seattle.gov/documents/departments/financedepartment/1621adopted ...
and include planned spending of more than $1 billion during 2016-2021. Key work includes street paving and resurfacing, ...
0.001864301 |
a/62545
sdot
https://www.seattle.gov/documents/departments/financedepartment/2025adopted ...
and curb ramps; school safety improvements; implementation of the Bike, Pedestrian, and Transit Master Plans
0.00186382385 |
a/63245
transportationstrategicplan1998
https://www.seattle.gov/documents/departments/sdot/transportationstrategicp ...
a new Master Plan forBoeing Field that has important implications for freight movement in ...
0.001863476 |
a/99037
sdotcip
https://www.seattle.gov/documents/departments/financedepartment/2025propose ...
sidewalks and curb ramps; school safety improvements; implementation of the Bike, Pedestrian, and Transit Master Pl ...
0.00186232885 |
a/63261
sdotcap
https://www.seattle.gov/documents/departments/financedepartment/1722propose ...
includes street paving and resurfacing; building new sidewalks and curb ramps; school safety improvements; implementation of the Bike and ...
0.00186114421 |
a/62722
sdotcap_000
https://www.seattle.gov/documents/departments/financedepartment/1520adopted ...
than $1 billion during 2016-2021. Key work includes street paving and resurfacing, building new sidewalks and curb ramps; implementation of ...
0.0018605704 |
a/62355
transportation
https://www.seattle.gov/documents/departments/financedepartment/1318propose ...
the six-year period, the CIP includes over $35.5 million for implementation of the Bicycle Master Plan and ...
0.00186037133 |
a/61992
transportation
https://www.seattle.gov/documents/departments/financedepartment/1318adopted ...
the six-year period, the CIP includes over $36 million for implementation of the Bicycle Master Plan and ...
0.00185873115 |
a/61982
249transportation
https://www.seattle.gov/documents/departments/financedepartment/1318adopted ...
the six-year period, the CIP includes over $36 million for implementation of the Bicycle Master Plan and ...
0.00185873115 |
a/61971
2017-11-06_annexiv.eop
https://www.seattle.gov/documents/departments/emergency/plansoem/2017-11-06 ...
2017-11-06_annexiv.eop City of Seattle Comprehensive Emergency Management Plan Emergency Operations ...
0.001858583 |
a/57011
2017-11-06_annexiv.eop(0)
https://www.seattle.gov/documents/departments/emergency/2017-11-06_annexiv. ...
2017-11-06_annexiv.eop(0) City of Seattle Comprehensive Emergency Management Plan Emergency Operations ...
0.001858583 |
a/56704
2017-11-06_annexiv.eop
https://www.seattle.gov/documents/departments/emergency/2017-11-06_annexiv. ...
2017-11-06_annexiv.eop City of Seattle Comprehensive Emergency Management Plan Emergency Operations ...
0.001858583 |
a/56705
transportation
https://www.seattle.gov/documents/departments/financedepartment/1116propose ...
for the transportation system over 2011 and 2012 and will accelerate implementation of the Bike and Pedestrian master ...
0.0018584897 |
a/61806
transportation
https://www.seattle.gov/documents/departments/financedepartment/1217adopted ...
of Transportation 2012 - 2017 Adopted Capital Improvement Program Control, Bridge Painting, and ADA Spot Improvements (a sub-program of ...
0.00185824709 |
a/61914
transportation
https://www.seattle.gov/documents/departments/financedepartment/1116adopted ...
and Pedestrian master plans and allow for increased maintenance of the City’s transportation assets. In ...
0.00185715873 |
a/61795
seattleindustrialfeisch3.8
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/indus ...
and policies in the Comprehensive Plan and/or the VISION 2050 regional growth plan, Countywide ...
0.00185649132 |
a/134526
sdot_2328cip
https://www.seattle.gov/documents/departments/financedepartment/2328adopted ...
ramps; school safety improvements; implementation of the Bike, Pedestrian, Freight, and Transit Master ...
0.00185631914 |
a/138625
190613_bmp_imp_outreachsummaryfinal
https://www.seattle.gov/documents/departments/sdot/about/documentlibrary/bi ...
& 4th Ave, MLK & Rainier – 99, Marginal Way ) people go 70 mph Infrastructure/ resources not equitable Bicycle Master ...
0.00185505708 |
a/99150
transportation
https://www.seattle.gov/documents/departments/financedepartment/1217propose ...
proceeds prevent SDOT from having to make cuts in Freight Spot Improvements, Neighborhood Traffic Control, Bridge Painting, ...
0.0018546877 |
a/61924
aceee2015scorecard
https://www.seattle.gov/documents/departments/ose/aceee2015scorecard.pdf
. The city has identified high-priority areas for potential new district energy systems. The city has developed at least one integrated ...
0.00185453286 |
a/88233
sdotcap
https://www.seattle.gov/documents/departments/financedepartment/1823propose ...
of the Bike and Transit Master Plans; investments to facilitate freight mobility; traffic ...
0.0018541147 |
a/62909
transportation
https://www.seattle.gov/documents/departments/financedepartment/1823propose ...
of the Bike and Transit Master Plans; investments to facilitate freight mobility; traffic ...
0.0018541147 |
a/62919
sdotcap
https://www.seattle.gov/documents/departments/financedepartment/1823adopted ...
to facilitate movement of freight throughout the city. 299Seattle Department of Transportation 2018-2023 Adopted Capital ...
0.0018541147 |
a/62891
memo-potential-seattle-2035-amendments-20160810
https://www.seattle.gov/documents/departments/council/committees/pluz/memo- ...
strategies. 58. Reference transportation modal plans (Pedestrian Master Plan, ...
0.00185363251 |
a/53449
sdotcip
https://www.seattle.gov/documents/departments/financedepartment/2328propose ...
sidewalks and curb ramps; school safety improvements; implementation of the Bike, Pedestrian, Freight, and Transit ...
0.00185346778 |
a/134220