Filter Results

9076 to 9100 of 11077
lpb022423leamingtonpacificbp
existing materials are incorporated into specifications• Sampling also allowed investigation of existing wall ...
0.00219216617 |
a/138931
2015secresidentialchapter1
)) allowed by this code, provided that any such alternative has been approved. The code official shall be permitted to ...
0.00219216617 |
a/97503
design review interim regulations - bill summary
exempt low-income housing and development that provide on-site units through the Mandatory Housing Affordability program from design review, ...
0.00219216617 |
a/182370
2026-homelessness-prevention-rfp_qa-v1
will provide training on both systems. Please refer to Section I. Data, Background Checks, Fiscal Sponsorship, and Other Requirements on ...
0.00219216617 |
a/182574
stormwaterpitchecklist
before you dig – Utility Locates 811 Project Address: ______________________________________ Date: ...
0.00219216617 |
a/98048
2015sebcintroduction
was utilized as the basis for the develop-ment, followed by a public forum in 2001 and the publication of the 2001 Final ...
0.00219216617 |
a/97146
2015sfcchapter26
of switches or elec-trical devices, equipment or systems could serve as a source of ignition shall be shut off. Exception: Circulating fans ...
0.00219216617 |
a/97644
2015sfcchapter35
contained flammable liquids, gases, or solids until the con-tainers and equipment have been thoroughly cleaned, inerted, or purged; except ...
0.00219216617 |
a/97654
2015sfcchapter31
structure or tent shall not exceed 10,000 square feet (929 m2). 2.2. The aggregate floor area of the building and membrane structure or tent ...
0.00219216617 |
a/97650
2015sfcindex
Streets and roads ....................... 505.2 Tenant spaces in covered malls . . . . . . . . 403.11.1.5 Utilities ...
0.00219216617 |
a/97691
desrptdaniel webster elementary school
to the western side of the building, with a new entrance constructed accessing the original basement level. The building’s circulation was ...
0.00219216617 |
a/75966
spp_ rfq_final_for_release
) High-Quality Learning Environments 3) Students and Family Supports The overarching goal of FEPP investments in Early Learning is to ...
0.00219216617 |
a/55933
ccinvoicechecklist
approved rate sheet. Ensure the Direct Charges on the invoice are allowable by contract. Eliminate unallowable costs (e.g. ...
0.002189833 |
a/58651
weeklybulletin032607final
, Magnuson Park Wetlands restoration and Lake WA Boulevard Trail development are all alternates for funding in the WWRP. Environment SHB ...
0.002189833 |
a/79859
2006_adopted_budget_process
also allows cities to adopt biennial budgets. In 1993, the City ran a pilot test on the concept of biennial budgeting for ...
0.002189833 |
a/60994
personnel_rule_9.2_
utilization of City of Seattle office facilities; C. Reduces absenteeism; D. Promotes employee health and wellness; E. ...
0.002189833 |
a/68900
personnel_rule_9.2_
utilization of City of Seattle office facilities; C. Reduces absenteeism; D. Promotes employee health and wellness; E. ...
0.002189833 |
a/68977
ffd_narrative
active year to allow the Department to undertake multi-year contracts. In 2006, FFD begins the implementation of four new ...
0.002189833 |
a/60901
sbeglossary
sbeglossary www.seattle.gov/util/SeattleBiologicalEvaluation SBE by City ...
0.002189833 |
a/113102
budget_process
by December 2 of each year for the fiscal year beginning January 1. The adopted budget appropriates funds and establishes legal expenditure ...
0.002189833 |
a/61025
ffd_narrative
in their first active year to allow the Department to undertake multi-year contracts. In 2006, FFD begins the ...
0.002189833 |
a/60948
transportation_overview
funding allows larger and more numerous pedestrian oriented projects to be constructed in 2008. The CIP also includes ...
0.002189833 |
a/61347
transportation_overview
is completed in phases as funding allows. The first phase of construction is scheduled to begin in 2009 between N. 137th ...
0.002189833 |
a/61164
sdot_overview
and reliability improvements along Aurora Avenue North from N. 110th St. to N. 145th St. Design and construction work is completed in ...
0.002189833 |
a/61204
sw barton st layover repaving project (faq nov 2025)
Seattle Municipal Code allows this kind of maintenance and repair work in areas at risk for landslides and sinking. King ...
0.002189833 |
a/175559