Filter Results

801 to 825 of 11838
2012srcchapter3
in accordance with the International Building Codeis permitted for all buildings and ...
0.00228677038 |
a/97805
2012seattlefirechapter9
stories in height shall be permitted to beinstalled throughout in accordance with NFPA 13R.NFPA 13R sprinkler systems are ...
0.00228654151 |
a/97616
4-0commentsampresponsesfeis2016_0505
residential neighborhoods, permitting allows for exceedingly tall structures which steal light. Why have walkable ...
0.0022864237 |
a/87480
lpbcurrentnom_sheridan
alterations or demolition of the subject building described within this report will require a permit from ...
0.00228641671 |
a/74539
2023-2024 mid-biennium adopted book
. This item supports several City priorities, including (1) Housing Permitting - Implementing modernized technology will ...
0.00228634756 |
a/153233
2018sbcchapter23
. The design of plank and beam flooring is permitted to be in accordance with the AWCWood Construction Data No. 4.WOOD2018 ...
0.00228626281 |
a/97436
treeregsconstitutentemailsthrough121719
one parcel into six – 11350, 11348, 11346, 11344 and 11342 23d Ave NE. Each newly created lot was approved for a single-family home. Anytime ...
0.00228625815 |
a/119502
ucuv_detail_permit_report(0)
in the permit application and not reported as individual units. Congregate residences include dormitory, group living and ...
0.00228620577 |
a/84308
2010_adopted_budget
in these sectors in the next few years. This means continued lower levels for construction-related revenues, such as sales taxes and ...
0.00228586933 |
a/61740
dr2017.01ebrfinal
permit documenting that at least 50% of the building is classified under the Seattle ...
0.00228580879 |
a/90326
dr2017.01ebrdraftv1
or construction permit documenting that at least 50% of the building is classified under the Seattle ...
0.00228580879 |
a/88293
dr2017.01ebrdraftv1
or construction permit documenting that at least 50% of the building is classified under the Seattle ...
0.00228580879 |
a/57396
dr2017.01ebrdraftv1
or construction permit documenting that at least 50% of the building is classified under the Seattle ...
0.00228580879 |
a/90325
dr2017.01ebrfinal
or fewer occupants c) Buildings used primarily for manufacturing or industrial purposes, as demonstrated by submitting one ...
0.00228580879 |
a/57397
charlesstreetrelocationanalysisreport
. A maximum FAR of 7 .0 is permitted if low-income housing is provided or a performance or payment option is considered . ...
0.00228551379 |
a/86568
appendix_p_madison_traffic_ops_update_memo
implementation of the project. As part of the updates, a revised PM peak hour build conditions analysis was conducted and n ...
0.00228541973 |
a/106143
uwmc-northwest-draft-mimp-09.05.2023
. Demolition permits may be submitted in advance of a building site being selected for development and any ...
0.00228493288 |
a/146543
2024 seattle stormwater management program plan
continued to build, improve, and refine this programmatic permit. On July 1, 2019, Ecology issued the ...
0.00228483742 |
a/155474
c3_delivery_assessment_10312023
through the City’s permitting process, the issue of the eligibility of an existing structure on the site for designation as ...
0.00228466978 |
a/151747
2006_entire_adopted_budget_document
; - Stormwater, Grading, and Drainage Control Ordinance; - Housing and Building Maintenance Code; and - Seattle Noise ...
0.00228463556 |
a/60998
lpbcurrentnom_guild45ththeatre
actually consists of two separate buildings, which are now combined to form a single property. These ...
0.00228462485 |
a/74481
2024floodplainreglationssepachecklist
is required (i.e., Master Use Permit, Building Permit, etc.) the floodplain development ...
0.00228413939 |
a/158928
4-3_written_comment_responses_mha_feis_2017
information not yet available, such as building footprints, heights, and locations. Evaluation of these impacts is best ...
0.002283634 |
a/65044
2016stormwatermanagementplan
will require, and what the permit process will entail. If the project is a multifamily or commercial ...
0.002283194 |
a/112698
soi
soi REHABILITATIONREHABILITATIONSTANDARDS FOR REHABILITATION & GUIDELINES FOR REHABILITATING HISTORIC BUILDINGS ...
0.002283148 |
a/74247
Previous 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 Next