Skip to main content
This is an official government website.

Search Results

Search

Filters
Topics [50]
Departments [170]
Audience [24]
Documents [9775]

Filters

Topics [50]
Departments [170]
Audience [24]
Documents [9775]

Results

6976 to 7000 of 11056
  1. bps-tag3-notes-03.03.22 – no offsets allowed, deal with it directly. But may be an equity opportunity by targeting where those offsets are ...
  2. ose_2023adopted_2024endorsed application will allow building owners and their representatives to comply with the BPS and Benchmarking data verification ...
  3. spd , north, south, and southwest patrol areas, with a police station in each area. The department's organizational model places ...
  4. cen ) for Seattle Parks and Recreation (SPR) and Seattle Center (CEN) one-time in 2026 instead of ongoing. In the 2025 Adopted Budget, Council ...
  5. sdotcap cost estimates, including those from associated utility work, may change. In addition to the new streetcar, the CIP also ...
  6. 2018-10-08 draft sir - license plate readers - for public ... for different monitored roadway segments, and average progress time along different monitored roadway segments, representative of travel ...
  7. 2018-10-08 draft sir - license plate readers - for public ... for different monitored roadway segments, and average progress time along different monitored roadway segments, representative of travel ...
  8. appendixb_geologysoilsreport of the Seattle Municipal Code [SMC]) and has developed a folio of maps of the geologically hazardous areas. In general, before development ...
  9. 7bmodelingqaqcchecklist in the Title block can contain any relevant information that modelers want to save with the model.Options:General - Rainfall/Runoff, ...
  10. northgateregionalcenterdraftplanappendix07_economicsrealestaterep ... 8,016 9,438 6,437 17.7% -31.8% Wholesale Trade, Transportation, Utilities (WTU) 161 181 143 12.4% -21.0% Government 109 153 ...
  11. seattleindustrialfeisch3.6 future traffic noise levels of 10 dBA or more above existing noise levels. ▪ After application of mitigation, the alternative fails to ...
  12. construction_scope_definitions_route 40 sidewalk•Trenching to upgrade underground utilities•Extending out the sidewalk where the design calls for it•Closing one ...
  13. seattle industrial deis ch 3.6 2021_12 cause future traffic noise levels of 10 dBA or more above existing noise levels.  After application of mitigation, the alternative fails to ...
  14. seattle_ccc_lpa_rpt_app_a_final_9-2014 Methodology and EstimatesAppendix F: Utility Impacts AssessmentAppendix G: Traffic AnalysisAppendix H Evaluation of ...
  15. 2012decembernewsletter —Page 5 Events and News Stories—Page 6 E The Open Public Meetings Act (OPMA) requires that every time a governing body—such as the ...
  16. 2019_annual_uof_report and December 31, 2018. Utilizing the advanced analytical capability available through the Data Analytics Platform (DAP), ...
  17. 21cp-s-accountability-assessment public confidence.”38 standing arbitration principle that generally allows an arbitrator to apply a higher evidentiary ...
  18. industrialmaritimestrategyreport2021 Department of Neighborhoods Jackie Mena, Seattle Department of Neighborhoods Diane Wiatr, Seattle Department of Transportation Anne ...
  19. newvisionforfreewaypark-activationplanpps_jan2005 displays.Small plaques indicating treeand plant species could become an educational tool for children.To do this,remove concrete plinths on ...
  20. seattle industrial deis ch 5 appendix b 2021_12 Wiatr, Seattle Department of Transportation Anne Grodnik-Nagle, Seattle Public Utilities Michelle Caulfield, Director, ...
  21. 2015residentialrecyclingstreamcompositionstudy 2015residentialrecyclingstreamcompositionstudy Seattle Public Utilities 2015 Residential Recycling Stream Composition ...
  22. designstudy . It is possible to design safebicycle and pedestrian facilities along roadways with high volumes of truck traffic. A typicalimpact to ...
  23. 2025 summary report Police Department (SPD)• Seattle Public Utilities (SPU)Washington State• Governor’s Office of Indian Affairs (GOIA)• Office ...
  24. q2 2024 levy to move seattle report_final construction including installing utilities, watermain service connection, preparing for new sidewalks and curbs, and ...
  25. final_2025_tribal nations summit_summary report Parks and Recreation (SPR) • Seattle Police Department (SPD) • Seattle Public Utilities (SPU) Washington State • Governor’s ...