Filter Results

6926 to 6950 of 11838
2017accountabilityordinance_052217
have an identifiable representative; and 9 WHEREAS, district representation is a fundamental feature of representative democracy, and 10 has ...
0.00217029569 |
a/83748
ordinance_approved_052217_all_strikeouts_removed
of the city 8 have an identifiable representative; and 9 WHEREAS, district representation is a fundamental feature of representative ...
0.00217029569 |
a/52998
ordinance_approved_052217_all_strikeouts_removed(0)
areas of the city 8 have an identifiable representative; and 9 WHEREAS, district representation is a fundamental feature of representative ...
0.00217029569 |
a/52997
designreviewboard080917
lively, pedestrian oriented open spaces to enliven the area and attract interest and interaction with the site and building ...
0.00217029569 |
a/118646
cam_5973_fire_escape_testing
with the requirements of the Seattle Fire Code and the Seattle Building Code. Building ...
0.00217029569 |
a/64164
oed
) is committed to building an inclusive economy in the City of Seattle. OED works at all levels of our local economy to: • ...
0.00217029569 |
a/127232
7thavepblsepachecklist
is anticipated to begin in March 2017 with a construction duration of 5 to 6 months pending approvals and permits. 7. Do ...
0.00217029569 |
a/99975
oigreviewspdcrowdpolicyllweapons081420
of what tools should be available to SPD to address protestors who are engaged in violence, such as individuals who set occupied ...
0.00217029569 |
a/79755
25-26_spp_genericcontract
, fees, assessments, permit charges, etc. It is the Agency’s sole responsibility to monitor and determine any changes or ...
0.00217029569 |
a/175741
commercial-core-matrix
, the ratio of building floor area to lot area on which the buildingstandsNPO Neighborhood Planning Office (City of ...
0.00217023934 |
a/78357
aristandardforoutdoornoise
FactorFactor Value a. Equipment on ground or roof or in side of building wall with no adjacent reflective surface0 ...
0.00217023934 |
a/96511
gb-res-case-studio24
illustrates it’s possible to build a spa-cious, modern house nicely connected to useable outdoor space on a small, skinny, ...
0.00217023934 |
a/88380
lpb060122_villa_camini_draft_far_covenant
as the Villa Camini (the “Building”) that is located at 1205 NE 42nd Street in Seattle’s University District neighborhood, ...
0.00217023934 |
a/128599
draftthankyouchandatreeregs060920
a system in place in Accela with a tree-tracking worksheet to help plan reviewers track trees through the permit review ...
0.00217023934 |
a/118984
humandevelopmentelement
and hazards to health in the workplace, at home and at play.a. Make use of the City’s building and fire codes, food ...
0.00217023934 |
a/87593
idminutes3-13-18
included photographs, plans and samples. This building is located in Little Saigon within the newly expanded ISRD boundary ...
0.00217023934 |
a/73122
june132013approvedminutes
potentially be considered.   Updates from DPD on Microhousing   Mike Podowski & Geoff Wentlandt, DPD Planning  ...
0.00217023934 |
a/108843
lpbminutes_3-20-24
Luggage 1901-1911 3rd Avenue Request for extension 4 Ms. Sodt said permits are in for occupation of the ...
0.00217023934 |
a/156172
2021opa-0223ccs111921
that he was permitted to deploy his K-9 pursuant to policy in order to conduct a building search. NE#1 ...
0.00217023934 |
a/83585
092122lflatsticksr
of any building, or any portion of a building, structure or lot in a special review district, and no ...
0.00217023934 |
a/133450
dec_27_2023_city_to_hud_letter
forward and advance an updated Fort Lawton Redevelopment Plan to increase the number of units built as part of this project. ...
0.00217023934 |
a/151413
2018srcappendixf
of a building and connecting the subslab area withoutdoor air, thereby relying on the convective flow of air upward in the ...
0.00217023934 |
a/97856
psb081123postsr
the principal use of any building, or any portion of a building, structure or lot in a special review ...
0.00217023934 |
a/145628
attachment 1 - team questions for sp 4.24.17
planning on using without making any modifications? 12. When is the anticipated building permit ...
0.00217023934 |
a/56273
041422 - special events committee
that the following permit applications have been cancelled: ACT Gala and Fiesta 5K • The Chair has heard several concerns ...
0.00217023934 |
a/134729