651 to 675 of 1291
transportation
https://www.seattle.gov/documents/departments/financedepartment/0712propose ...
balance • Constituent balance SDOT staff evaluate the results of steps 3 and 4 together to identify projects for which ...
0.00215204339 |
a/61235
transportation
https://www.seattle.gov/documents/departments/financedepartment/0712adopted ...
): • Funding availability • Interagency coordination • Geographic balance • Constituent balance SDOT staff evaluate the ...
0.00215204339 |
a/61162
2019 legislative bulletin - week 13
https://www.seattle.gov/documents/departments/oir/2019 legislative bulletin ...
roster process and limited public works project cost thresholds. Requires a municipality soliciting competitive bids for ...
0.00215204339 |
a/79802
2019 legislative bulletin - week 13
https://www.seattle.gov/documents/departments/oir/2019 bulletins/2019 ...
roster process and limited public works project cost thresholds. Requires a municipality soliciting competitive bids for ...
0.00215204339 |
a/80026
ellrfqfinal
https://www.seattle.gov/documents/departments/oira/ellrfqfinal.pdf
outcomes in a pre-approved data management system as a condition of funding. Contracting Requirements Any contract ...
0.00215204339 |
a/80340
2019 legislative bulletin - week 9
https://www.seattle.gov/documents/departments/oir/2019 bulletins/2019 ...
priced contract. Increases the small works roster process and limited public works project cost thresholds. Requires a municipality ...
0.00215204339 |
a/80035
2019 legislative bulletin - week 9
https://www.seattle.gov/documents/departments/oir/2019 legislative bulletin ...
priced contract. Increases the small works roster process and limited public works project cost thresholds. Requires a municipality ...
0.00215204339 |
a/79811
100312adoptedufcmeetingsummary
https://www.seattle.gov/documents/departments/urbanforestrycommission/2012/ ...
that in the first round. That results in a very expensive permit because you need an arborist. JR – it would be for the ...
0.00215204339 |
a/118123
seattlemaritimestudy-2009
https://www.seattle.gov/documents/departments/economicdevelopment/keyindust ...
from 2006. Overall economic impacts of the cluster are presented in the next section. Subsequent sections cover significant features of ...
0.00215204339 |
a/56438
seacap2006plan
https://www.seattle.gov/documents/departments/ose/seacap2006plan.pdf
ultimately.Improvements to Sound Transit’s Express Bus system are planned. Those already in place resulted in 8.8 million ...
0.00215204339 |
a/88486
rpmtgmaterials20250115
https://www.seattle.gov/documents/departments/citylightreviewpanel/document ...
results from the resumption of disconnection policy, This spring we re-started this, after 6+ years of not sending notices. ...
0.00215204339 |
a/164330
rp packet_11202024_rev
https://www.seattle.gov/documents/departments/citylightreviewpanel/document ...
their data sources to estimate 113,000 eligible households. Q: There’s an increase in utilization of Emergency Bill Assistance (EBA) this ...
0.00215204339 |
a/162761
foodandfarms_roundtable_final_recs_w_appendix_june_2014
https://www.seattle.gov/documents/departments/ose/foodandfarms_roundtable_f ...
result in a $434 million annual income increase for local producers and food businesses. Strategies Suggested strategies ...
0.00215204339 |
a/88352
outdoor preschool rfp final 11.14.24
https://www.seattle.gov/documents/departments/parksandrecreation/aboutus/rf ...
), Jefferson Park (Beacon Hill), John C. Little Park (Beacon Hill) and Carkeek Park (Broadview). The success of this pilot led to an RFP in ...
0.00215204339 |
a/162903
lpbcurrentnom_swed_supplemental report_bola
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
in mid‐2019. However, the report results from a collaborative effort. Susan initiated research in ca. 2009 with collectio ...
0.00215204339 |
a/74549
2017_costestimatesmemo
https://www.seattle.gov/documents/departments/sdot/transitprogram/rapidride ...
, quantities and unit costs were developed and summarized in the various cost categories. Unit Costs Unit costs were developed from selected ...
0.00215204339 |
a/106263
sandpointnavalairstationlandmarkdistrictadopted7-3-13_withappendi ...
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
information to supplement thefollowing design drawingsSign Specifications 10425-1Standard written specifications for use when ...
0.00215204339 |
a/75801
sandpoint-guidelines
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
drawingsSign Specifications 10425-1Standard written specifications for use when bidding each signage procurementpackage; ...
0.00215204339 |
a/74278
sandpointnavalairstationlandmarkdistrictadopted7-3-13_withappendi ...
https://www.seattle.gov/documents/departments/parksandrecreation/aboutus/rf ...
information to supplement thefollowing design drawingsSign Specifications 10425-1Standard written specifications for use when ...
0.00215204339 |
a/140665
07-09-09
https://www.seattle.gov/documents/departments/parksandrecreation/minutes/20 ...
, the grounds maintenance staff started a 7-day per week coverage. This new schedule resulted in a high number of Parks ...
0.00215204339 |
a/92065
fs23_struct_dwgs
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
to the specifications for information in addition to that covered by these structural notes and drawings.DOCUMENTSStructural Documents shall ...
0.00215204339 |
a/75253
fs23_structural_dwgs
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
to the specifications for information in addition to that covered by these structural notes and drawings.DOCUMENTSStructural Documents shall ...
0.00215204339 |
a/75252
dnsaddendum-2017spotsewer-5thavesewer-031121(0)
https://www.seattle.gov/documents/departments/spu/documents/sepa/dnsaddendu ...
and construction of these repairs, SPU uses a unit-price-based construction contract. The construction bid document defines ...
0.00215179962 |
a/112837
dnsaddendum-2017spotsewer-5thavesewer-031121
https://www.seattle.gov/documents/departments/spu/documents/sepa/dnsaddendu ...
and construction of these repairs, SPU uses a unit-price-based construction contract. The construction bid document defines ...
0.00215179962 |
a/112838
green_2008report
https://www.seattle.gov/documents/departments/fas/purchasingandcontracting/ ...
facilitating and promoting responsible environmental practices, and introducing bid specifications and inviting proposals ...
0.00215179962 |
a/58942