Filter Results

626 to 650 of 9052
seattle-2021-stormwaterplan
will require, and what the permit process will entail. If the project is a multifamily or commercial ...
0.002250165 |
a/113469
desrptlaquinta
of the detached concrete block garage. The building permit was pulled in February of 1950 under the last ...
0.00224965019 |
a/76144
2021sbcchapter11
. Accessibility is not required in buildings and facilities, or portions thereof, to the extent permitted ...
0.00224964 |
a/162480
2009npdesphase1stormwatermanagementprogram
is reviewed by the site inspector. A permit cannot be finalized without as-built approval. Approved ...
0.002249065 |
a/112566
2009npdesphase1stormwatermanagementprogram
is reviewed by the site inspector. A permit cannot be finalized without as-built approval. Approved ...
0.002249065 |
a/113431
seattle_bike_share_permit_requirements_v2.1_20181219
seattle_bike_share_permit_requirements_v2.1_20181219 Free-Floating Bike Share Program Permit Requirements ...
0.00224890513 |
a/100223
seattlebikesharepermitrequirementsv2.1final20181116
seattlebikesharepermitrequirementsv2.1final20181116 Free-Floating Bike Share Program Permit Requirements for the 2018-2019 ...
0.00224890513 |
a/100215
2018sfgcchapter1
in effect on the date used to determine the codes appli-cable to the building permit application according ...
0.00224883249 |
a/97209
design-review-ord
, affordable housing production requirements in Section 23.75.085; 17 32. ((Standards for structural building overhangs in ...
0.00224872073 |
a/53430
design-review-ord
, affordable housing production requirements in Section 23.75.085; 17 32. ((Standards for structural building overhangs in ...
0.00224872073 |
a/118644
2012srcappendixe
obtaining a permit from the building official. Aseparate permit shall be required for ...
0.00224871677 |
a/97773
2012sbcchapter2
. Acanopy is permitted to be structurally independent or sup-ported by attachment to a building on one or ...
0.00224829256 |
a/97351
2018sfcchapter11
((construction)) requirements where such existing buildings do not comply with the minimumrequirements of the International ...
0.00224812422 |
a/97703
sdot dr 01-2021
will be provided by SDCI. Physical elements required by the Director’s Decision should be both listed in the TMP and included on plans for ...
0.00224795868 |
a/99212
dr2020-5 - tmp
will be primarily responsible for ensuring the TMP is both established prior to permit issuance(s) and then implemented and ...
0.00224795868 |
a/106494
2018sebcintroduction
accessibility provisions and alternatives permitted in existing buildings. Appendix B was added to address ...
0.002247825 |
a/97169
09-14-06
with tenants and developers 2007 Council approval of agreements Complete related actions – zoning, shoreline permits ...
0.00224776752 |
a/92006
2018sebcchapter5
or 903.3.1.2 of the International Building Code has been added, and the building is nowsprinklered ...
0.00224775053 |
a/97162
gl_existing buildings
needed) and Contributing Buildings Only penthouses permitted per SMC23.66.140 C.f and I(?) (for ...
0.00224709627 |
a/74145
existing
is also acceptable. ii. Criteria for Historic (definition needed) and Contributing Buildings Only penthouses ...
0.00224709627 |
a/74139
2021sbcchapter17
special inspectors shall be registered with the Washington Association of Building Officials. A registered civil or ...
0.00224699546 |
a/162481
context-waterfront
and Talbot coal companies. Yesler subsequently not only extended the pier even further into Elliott Bay, but he also added more ...
0.00224667019 |
a/74349
57_ifc_2021
, the International Building Code and the International Mechanical Code pertaining to flammable liquids shall apply. [S] ...
0.0022460164 |
a/139036
2021sfcchapter57
of contaminated materials. 3. A detailed site plan shall be submitted with each application for a permit. The site plan ...
0.0022460164 |
a/162539
2021sebcchapter13
welfare in existing buildings and structures whil e permitting ((,)) alteration, addition and ...
0.00224581268 |
a/162631