Filter Results

601 to 625 of 9052
gl_intro
of use after initial approval. • Use, design and demolition approval is required before any building or other City ...
0.00225403765 |
a/74146
2010stormwatermanagementplan
the planning stage and, later, an as-built plan which is reviewed by the site inspector. A permit cannot be finalized ...
0.00225389 |
a/113433
adopted091119meetingsummary
of building 2 mini-mansions. The Department of Construction and Inspections told me that “developers in Seattle have the ...
0.002253247 |
a/118926
desrptdonahoe
, and significant alterations to the exterior storefronts. Permits and historic tax assessor photographs provide ...
0.00225318875 |
a/75972
2021sebcchapter5
throughout, the required fire-resistance ratings of building elements and materials shall be permitted to ...
0.0022527785 |
a/162623
industrialmaritimenewindustrialzoningordinance
be made 18 known to community and charitable groups through means such as newspaper articles, radio 19 announcements, and flyers. 20 d. No ...
0.00225275988 |
a/140625
seattle_2020_stormwater_plan
adopted codes, and the building permit is issued when the plans comply with these codes and the ...
0.002252689 |
a/113493
treeregsconstitutentemailsthrough120519
for a single-family home. Anytime a permit to build is submitted, SDCI works to ensure that the plans go ...
0.00225268863 |
a/119500
18developmentservicesfinal
................................................................................................................. 18-5 18.4.3 ...
0.00225254637 |
a/113612
desrptgriffin
. A more thorough analysis of the structure will need to be undertaken to assess the extent of the damage to the concrete structural system. ...
0.00225219014 |
a/76078
desrptgriffin building
of the mortar. A more thorough analysis of the structure will need to be undertaken to assess the extent of the damage to the concrete ...
0.00225219014 |
a/76077
desrpt_griffin
. A more thorough analysis of the structure will need to be undertaken to assess the extent of the damage to the concrete structural system. ...
0.00225219014 |
a/76335
2021sfcchapter12
the edges of the roof. Exception: Where either axis of the building is 250 feet (76 200 mm) or less, the clear perimeter ...
0.002251992 |
a/162447
2018seccommercialchapter5
-factors for the existing envelope assemblies may be inaccordance with the edition of the Washington State Energy Code that was in effect at ...
0.00225193333 |
a/97523
2012seattlefirechapter2
hydrant availability, that are suitable to permit certainrepairs to vessels.DETACHED BUILDING. A separate ...
0.0022518218 |
a/97571
sepa_checklist_beps
anticipates building permit applications for building retrofits and mechanical system ...
0.00225159456 |
a/143303
seagreen-guide
with the building permit application. Projects that include 5,000 square feet or more of new impervious ...
0.00225145533 |
a/67393
adopted090419meetingsummary
no building plan permits for these three (3) unit lots on the street facing half and two (2) unit lots on ...
0.00225121668 |
a/118925
12_ifc_2021_with_2024_ifc_changes_without_comments
perimeter around the edges of the roof. Exception: Where either axis of the building is 250 feet (76 200 mm) or less, the ...
0.002251061 |
a/139966
psbminutes8-16-17
floor windows on primary building facades is not permitted. (8/93, 7/99, 7/03) B. General Signage ...
0.00225071 |
a/73817
pspb060122_section_2
. For all existing buildings, windows at street level shall permit visibility into the business, and ...
0.00225071 |
a/128628
pspb052522_section_2
. For all existing buildings, windows at street level shall permit visibility into the business, and ...
0.00225071 |
a/128508
2018smcchapter1
in effect on the date used to determine the codes appli-cable to the building permit application according ...
0.00225039641 |
a/97267
context-pioneer-square
to encompass buildings associated with the war effort during World War I and/ or completedbetween 1911 and 1927. A fourth ...
0.0022502637 |
a/74342
seattlebikesharepermitrequirements2018
seattlebikesharepermitrequirements2018 Free-Floating Bike Share Program Permit Requirements for the 2018-2019 ...
0.00225018733 |
a/100214