Filter Results

6001 to 6025 of 11001
ballardguidelines
) Blank Walls (former D-2) Visual Impacts of Parking Structures (former D-5) Screening of Dumpsters, Utilities and Services ...
0.002200474 |
a/87949
sdot acyclica sir draft - for public comment 2019-02-05(0)
. This data allows traffic engineers to correct traffic signal timing and provide information to travelers about expected ...
0.002200474 |
a/117184
ballarddg2013
Walls (former D-2) Visual Impacts of Parking Structures (former D-5) Screening of Dumpsters, Utilities and Services (former ...
0.002200474 |
a/96279
investigation report - 0286_redacted
subsequent to the interviews and provided sufficient time after each interview to allow any such additional information to ...
0.002200474 |
a/163730
cen
involvement of its security officers. This increase will allow for officers on those shifts to patrol in teams. Proposed ...
0.002200474 |
a/63274
doit
sources within the City, including the General Fund, Seattle City Light, Seattle Public Utilities, Seattle Department of ...
0.002200474 |
a/62410
doit
sources within the City, including the General Fund, Seattle City Light, Seattle Public Utilities, Seattle Department of ...
0.002200474 |
a/62482
sdot_430_464
such as permits, utility cut restorations, and reimbursable contract work performed at the request of developers and the ...
0.002200474 |
a/62138
crs
Holdings, allowing the project to proceed. The agreement requires Bluefield Holdings to maintain the habitat for an initial ...
0.002200474 |
a/62406
bgt_revisedsepachecklist_final
Ave NW to allow room for the trail. Construction may begin as early as autumn of 2011. Project phasing will depend on a ...
0.002200474 |
a/99405
bgt_revisedsepachecklist_final
Ave NW to allow room for the trail. Construction may begin as early as autumn of 2011. Project phasing will depend on a ...
0.002200474 |
a/100464
crs
, allowing the project to proceed. The agreement requires Bluefield Holdings to maintain the habitat for an initial term ...
0.002200474 |
a/62478
sdot
Inspection fees, which are billed to property owners and developers. This item will add capacity to the team to allow them ...
0.002200474 |
a/177938
sfab nov 2022 minutes - approved
meeting would allow him to come and meet with the board. I am also noting that we should have election of officers, so I am ...
0.002200474 |
a/138434
2021sebcchapter8
. 6.2. In buildings that do not comply with the provisions of this code for number of stories, allowable area, height or ...
0.002200474 |
a/162627
food-service-packaging-business-requirements_english
food-service-packaging-business-requirements_english Food Service RequirementsRECYCLING: Seattle businesses are not allowed ...
0.002200474 |
a/150579
2007cdlwastecompostitionstudy
2007cdlwastecompostitionstudy Seattle Public Utilities 2007 Construction & Demolition Waste Composition Study FINAL ...
0.002200474 |
a/112545
center
for KeyArena staff to enter the facility. The waterproof membrane that runs the length of tunnel has failed, allowing ...
0.002200474 |
a/60523
2023-mcpp-cpd_report
at the micro-community (neighborhood) and precinct levels. All who live and/or work in Seattle were eligible to participate in the virtual ...
0.002200474 |
a/154550
seattleindustrialfeisch3.13
:58 6:37 5:08 Note: The Seattle Police Department utilizes the median value of this dataset because it is less impacted by ...
0.002200474 |
a/134527
seattledesigncommission-2008.03.06firestation39minutes
) to allow for enhanced Figure 3: Section looking South Figure 3: Section looking North Figure 3: Site Plan 4pedestrian ...
0.002200474 |
a/85419
seattledesigncommission-2008.03.06highlandstreetvacationminutes
approval) to allow for enhanced Figure 3: Section looking South Figure 3: Section looking North Figure 3: Site Plan ...
0.002200474 |
a/85420
parkdistrictagenda_11-21-2024
& Accountability: Restroom Audit6 restrooms renovations complete to date, with 2 in construction.10 restrooms weatherized in 2023 to ...
0.002200474 |
a/162933
regulating-short-term-rentals_policy-brief_2017-04
with multiple entire-home listings increased by 183 percent between 2015 and 2016.10 Commercial enterprises utilizing ...
0.002200474 |
a/53879
2020_q1_report_0324_2020_final
: underspent by $1.6M due to various reasons including bid opening delays for a Lake City Way corridor project (led by Washington State ...
0.002200474 |
a/99566