You just searched for:
Search
Filter Results
5076 to 5100 of 11838
adaparkingroute11floorspq
https://www.seattle.gov/documents/departments/seattlegovportals/citydepartm ...
BuildingCITY OF SEATTLECentral Building - 810 Third Ave.• Mayor’s Office for Seniors - 3rd Floor –Gold Cards/Flash Cards ...
0.00218177657 |
a/107442
presentation20190502
https://www.seattle.gov/documents/departments/neighborhoods/majorinstitutio ...
public comment.C.It shall recommend the maximum departure which may be allowed for each development standard from which a departure has been ...
0.00218177657 |
a/76692
psbsidewalkcafesr
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
including: How gas and electricity would reach the café and if that would have an impact on the building or require ...
0.00218177657 |
a/174824
topmistakesmfpermits
https://www.seattle.gov/documents/departments/sdci/about/topmistakesmfpermi ...
topmistakesmfpermits 700 Fifth Avenue, Suite 2000 | PO Box 34019 | Seattle, WA 98124-4019 | 206-684-8600 | seattle.gov/sdci Top ...
0.00218177075 |
a/165242
2022izsummary
https://www.seattle.gov/documents/departments/sdci/codes/2022izsummary.pdf
on approved building plans and may contain errors and omissions. Incentive Zoning (IZ) Summary ReportData from 1/1/2022 ...
0.00218177075 |
a/96503
5124cam_photovoltaicpowersystems
https://www.seattle.gov/documents/departments/fire/business/5124cam_photovo ...
with all code and rule requirements, whether or not described in this CAM. CAM #5124 Client Assistance Memo Seattle Fire Department Seattle ...
0.00218177075 |
a/64048
sli_2324adopted_mid-biennium
https://www.seattle.gov/documents/departments/financedepartment/2324adopted ...
, "This [staffing] blueprint provides us with a map to build up operations over the next several years as resources allow." ...
0.00218177075 |
a/153227
2009annualreport
https://www.seattle.gov/documents/departments/sdot/about/documentlibrary/re ...
the DIRECTORIn my role as director of the Seattle Department of Transportation (SDOT), I am very excited to ...
0.00218177075 |
a/99361
ovg nasc arena presentation 42717
https://www.seattle.gov/documents/departments/economicdevelopment/arena ...
by SDOT40 daysMon 6/11/18Fri 8/3/185860% SIP Approved (prior to Building Permit submittal)0 daysFri 8/3/18 ...
0.00218177075 |
a/56251
101310tpo_draft letter
https://www.seattle.gov/documents/departments/urbanforestrycommission/2010/ ...
are currently required for sewer work, fixing retaining walls, building high fences, electrical work, ...
0.00218173978 |
a/117905
100610tpo_draft letter
https://www.seattle.gov/documents/departments/urbanforestrycommission/2010/ ...
are currently required for sewer work, fixing retaining walls, building high fences, electrical work, ...
0.00218173978 |
a/117904
annualreportjuly2013june 2014
https://www.seattle.gov/documents/departments/neighborhoods/majorinstitutio ...
environmental review at the time of application for Master Use and/or building permits. Additional ...
0.00218173978 |
a/77158
sr_isrd13220
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
SMC 23.66.318 - Demolition SMC 23.66.320 - Permitted uses SMC 23.66.326 – Street level uses SMC 23.66.328 – Uses above ...
0.00218173978 |
a/73371
psb050824600alksr
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
not permitted. (7/99) D. Color. Building facades are primarily composed of varied tones of red brick ...
0.00218173978 |
a/156005
final report_tree regulation research ...
https://www.seattle.gov/documents/departments/urbanforestrycommission/resou ...
team’s recommendations was to continue the work as Phase II, and apply the research methodology/protocol to Lowrise Multifamily and ...
0.00218173978 |
a/119454
treeregsresearchprojectphaseiifinalreport033117
https://www.seattle.gov/documents/departments/urbanforestrycommission/resou ...
was to continue the work as Phase II, and apply the research methodology/protocol to Lowrise Multifamily and Single-family zones, and ...
0.00218173978 |
a/119504
masterplanannualreport-2013
https://www.seattle.gov/documents/departments/neighborhoods/majorinstitutio ...
require additional environmental review at the time of application for Master Use and/or building permits. ...
0.00218173978 |
a/77174
seattle_b4b-buildforbroadband_exteriorconnections_tip-6000_update ...
https://www.seattle.gov/documents/departments/tech/seattle_b4b-buildforbroa ...
seattle_b4b-buildforbroadband_exteriorconnections_tip-6000_updated_7.2024 B4B - Build for Broadband ENSURING BROADBAND ...
0.00218173978 |
a/158587
seattle_b4b-buildforbroadband_exteriorconnections_tip-6000 ...
https://www.seattle.gov/documents/departments/tech/seattle_b4b-buildforbroa ...
seattle_b4b-buildforbroadband_exteriorconnections_tip-6000 (5.2024) B4B - Build for Broadband ENSURING BROADBAND ...
0.00218173978 |
a/156954
3039303-sd decision
https://www.seattle.gov/documents/departments/neighborhoods/majorinstitutio ...
of Development Standard Departure for Public Schools (SMC Chapter 23.79) to approve or condition the following departures: 1. To allow ...
0.00218173978 |
a/136499
2025_rentalhousing_nofa_seattleoh
https://www.seattle.gov/documents/departments/housing/fundingopportunities/ ...
million per building has been removed. There is now no limit on funding that may be requested per ...
0.00218173978 |
a/171292
cam2308
https://www.seattle.gov/documents/departments/sdot/cams/cam2308.pdf
cam2308 VOLUNTARY CURBSIDE RAIN GARDENS | 1 2308CLIENT ASSISTANCE MEMOSEATTLE PERMITS - Part of a multi-departmental ...
0.00218173978 |
a/101631
oca_crime_prevention_review_09-05-2012
https://www.seattle.gov/documents/departments/cityauditor/auditreports/oca_ ...
. The SEOs use a unique strategy (including relationship-building, becoming an integral part of the school community, ...
0.00218173978 |
a/127434
2012crimepreventionassessment
https://www.seattle.gov/documents/departments/cityauditor/auditreports/gun ...
a unique strategy (including relationship-building, becoming an integral part of the school community, conflict resolution, ...
0.00218173978 |
a/167014
bhbr_northseg_earlydesign_outreachsummary_surveyfeedback
https://www.seattle.gov/documents/departments/sdot/bikeprogram/beacon hill ...
the car crash into new build townhomes by 15th and grand, drivers treat this section like a chicane on a race track, ...
0.00218173978 |
a/138296
Previous
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
Next