Search Results
Results
4701 to 4725 of 11057
- mtgnotes_20240925 himself and explained his prior relevant work experience at City Light and Seattle Public utilities. Brittney Garcia ... 0.00223029521 | | a/162760
- 07.16.2020 ddr2020-13 the activity, or repairing the utility; and • When development is proposed and allowed per Chapter 25.11, ... 0.00223029521 | | a/119443
- sepa-draft_proposed-legislation mobile home park zoning regulations to encourage long-term viability of mobile 2 home parks as one of several allowed land ... 0.00223029521 | | a/53410
- faqs - 5g and small wireless facililties (swf) on seattle poles ... ? .......................................................... 3 Who is subject to the City’s design standards for small cell facilities on ... 0.00223029521 | | a/153384
- 23rdavenueactionplanphase2visionsgoalsstrategiesactions + 19 = 29 15. Preserve the existing historic characteristics -Union can withstand greater density and business -New development ... 0.00223029521 | | a/86194
- hmc_dpd_annual_status_report_updated_8_13_20 TO PROPOSED MASTER PLAN 1. The maximum campus development density standard for the Harborview MIO should be increased from the FAR 3.4 ... 0.00223029521 | | a/76774
- harborviewsacannualreportpresentation MASTER PLAN 1. The maximum campus development density standard for the Harborview MIO should be increased from the FAR 3.4 proposed by ... 0.00223029521 | | a/76768
- harborview medical center dpd annual status report june 2021 - ... to be used) MODIFICATIONS TO PROPOSED MASTER PLAN 1. The maximum campus development density standard for the Harborview MIO should be ... 0.00223029521 | | a/135328
- harborview medical center dpd annual status report june 2022 - ... to allow greater flexibility for future in-fill development and greater utilization of the ... 0.00223029521 | | a/147413
- psbminutes2-1-17 . (12/94) 3. Be a maximum of two and one half feet wide; (12/94) 4. Be a free-standing A-frame type sign to allow a ... 0.00223029521 | | a/73804
- uwmc_nwcampus_dac_notes_meeting 6 be separate from utilities and should not be included. • Land Use (height, bulk, scale, setbacks) (3) (Scott, Shawn, ... 0.00223029521 | | a/145788
- fas online customer interactions for those with smartphones, in 2013 FAS launched Find It, Fix It, a smartphone application that ... 0.00223029521 | | a/62213
- 23rdavenueactionplanjune29workshopandjuly17openhousecombinedsumma ... -utilized now -Footprint considerations -Design of buildings vs. size - Future development should reflect the 15 + 5 = 20 X ... 0.00223029521 | | a/86190
- 25.02.27 district decarbonization meeting summary building(s) on district energy that also have a fossil fuel utility meter: i. Include energy use as a subtotal in the plan ... 0.00223029521 | | a/166962
- fas % of the calls are answered within 60 seconds. Also, to improve online customer interactions for those with smartphones, in 2013 FAS ... 0.00223029521 | | a/62293
- 2023 sir hostage negotiation throw phone hostage negotiators. At times there are no other means of phone communication with the subject and this system allows for ... 0.00223029521 | | a/141092
- desrpt_bordeaux sidewalks with nine-foot-wide parking strips, laid six-inch diameter water mains and eight-inch diameter sanitary sewer pipes, and made ... 0.00223029521 | | a/76326
- desrptbordeaux sidewalks with nine-foot-wide parking strips, laid six-inch diameter water mains and eight-inch diameter sanitary sewer pipes, and made ... 0.00223029521 | | a/75913
- drainagereviewchecklist Seattle Public utility (SPU) Public Drainage System Director’s Rule for additional requirements. See Volume 1 and Appendix ... 0.00223029521 | | a/96526
- seattledesigncommission-2009.08.06centerforwoodenboatsminutes it was the most constrained. The fact that the tunnel is now being implemented still gives resonance to the assumptions used in the early ... 0.00223029521 | | a/85489
- seattledesigncommission-2009.08.06westlaketransportationhubstrate ... Project because it was the most constrained. The fact that the tunnel is now being implemented still gives resonance to the assumptions ... 0.00223029521 | | a/85490
- rsji and expertise. To increase OCR's capacity to support departments and Citywide initiatives, this budget proposes to increase two part-time ... 0.00223029521 | | a/63056
- 2023-03-02.approved_emcitywide 2023-2025.stratplan of the identified goals. If high priority projects need to be adapted due to emergency response demands and/or workload adjustments, the ... 0.00223029521 | | a/139541
- loc_081115 presentation. The family or advocate is coached to listen and allow the student to lead the conference. SPS/City SPP ... 0.00223029521 | | a/79041
- dpr Specialist; Recreation Leader; Recreation Attendant to lead customer service, front-desk operations, and rentals; Utility ... 0.00223029521 | | a/62940