You just searched for:
Search
Filter Results
3976 to 4000 of 11795
idminutes9-26-17
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
, but they were told it was too cost prohibitive. Ms. Frestedt asked if there are other building Code considerations and ...
0.002191362 |
a/73165
pspbminutes7-17-19
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
the building still had its original use designation and that she was just bringing the permit up to date ...
0.002191362 |
a/74083
idminutes3-28-17
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
installation of a split air conditioning system to be installed on top of the canopy above the storefront. Exhibits included plans and 3 ...
0.002191362 |
a/73126
sdot
https://www.seattle.gov/documents/departments/financedepartment/20proposedb ...
that keep people and goods moving throughout the city, which includes operating the city's movable bridges and traffic signals, cleaning ...
0.002191362 |
a/63382
20151015_lhes departures meeting 2 reduced
https://www.seattle.gov/documents/departments/neighborhoods/majorinstitutio ...
than 4:12. No portion of a shed roof is permitted to extend beyond the 35‐foot height limit under this provision. ...
0.002191362 |
a/76814
psbminutes12-6-17
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
Minutes approved. Ms. Curran abstained. 120617.2 APPLICATIONS FOR CERTIFICATES OF APPROVAL 120617.21 Theater Building ...
0.00219135778 |
a/73803
seattledesigncommission-2007.11.01broadstreetgreenstreetminutes
https://www.seattle.gov/documents/departments/opcd/designcommission/project ...
for the design contract to create the new park. The current budget for building a new skatepark is $960,000 for ...
0.00219135778 |
a/85410
fas
https://www.seattle.gov/documents/departments/financedepartment/2227propose ...
. Thematic Priorities FAS is responsible for the operation and maintenance of approximately 3.2 million square feet of ...
0.00219135778 |
a/63560
fascip
https://www.seattle.gov/documents/departments/financedepartment/2126propose ...
– Thematic Priorities FAS is responsible for the operation and maintenance of approximately 3.2 million square feet of ...
0.00219135778 |
a/63413
2020_oh_annualinvestmentsreport
https://www.seattle.gov/documents/departments/housing/reports/investmentsre ...
- and income-restricted homes • Twenty-five additional OH-funded rental buildings were in permitting or ...
0.00219135778 |
a/158544
john rogers es don recommendations final v2
https://www.seattle.gov/documents/departments/neighborhoods/majorinstitutio ...
on existing public-school sites, the maximum permitted height is 35 feet. Allowed Building Height: 35 feet ...
0.00219135778 |
a/138725
spc_affordablehousingrpt
https://www.seattle.gov/documents/departments/seattleplanningcommission/aff ...
the effects of regulatory processes on housing price, strive to minimize the time taken to process land use and building ...
0.00219132635 |
a/108131
spc_affordablehousingrpt
https://www.seattle.gov/documents/departments/seattleplanningcommission/com ...
the effects of regulatory processes on housing price, strive to minimize the time taken to process land use and building ...
0.00219132635 |
a/108187
2023_2024_pmp_implemplan_appendices
https://www.seattle.gov/documents/departments/sdot/about/documentlibrary/pe ...
in pedestrian travel to launch new, innovative programs to improve conditions for people walking and rolling on neighborhood streets. ...
0.00219132635 |
a/156269
2022_2024_pmp_implemplan_v8_appendices
https://www.seattle.gov/documents/departments/sdot/about/documentlibrary/pe ...
Healthy Streets and Safe Start Permits helped to encourage physical distancing during the pandemic and make neighborhood ...
0.00219132635 |
a/139489
c3_delivery_assessment_executive_summary_10312023
https://www.seattle.gov/documents/departments/sdot/streetcar/c3_delivery_as ...
Certificate of Approval5. Pike Place Market Historical Commission Certificate of Approval6. Building ...
0.00219132635 |
a/151746
seattle-water-rev-2012-os
https://www.seattle.gov/documents/departments/seattlegovportals/business/in ...
granted a license to Seattle City Light to build a hydroelectric power plant on the South Fork of the Tolt River, resulting ...
0.00219132635 |
a/107420
seattle-water-rev-2012-os
https://www.seattle.gov/documents/departments/investorrelations/delete/seat ...
granted a license to Seattle City Light to build a hydroelectric power plant on the South Fork of the Tolt River, resulting ...
0.00219132635 |
a/58574
sdotcip
https://www.seattle.gov/documents/departments/financedepartment/2227adopted ...
:NorthgateThis project provides design review, permitting, and construction support services for the Sound Transit Lynnwood ...
0.00219127 |
a/127136
sdot
https://www.seattle.gov/documents/departments/financedepartment/2227propose ...
) is responsible for building and maintaining a safe, reliable, efficient, and socially equitable transportation network. ...
0.00219127 |
a/63567
oed_jobs_plan_8-25-2011-final
https://www.seattle.gov/documents/departments/economicdevelopment/oed_jobs_ ...
entrepreneurs and growing businesses, • Improving competitiveness by building on our economic strengths, • Investing in nex ...
0.00219127 |
a/56198
zoning_growth_report
https://www.seattle.gov/documents/departments/opcd/demographics/aboutseattl ...
awaiting final inspection.Source: SDCI Permit Data Warehouse Building Construction ...
0.00219116756 |
a/84313
ovg seattle center - part 1 of responses to city follow-up ...
https://www.seattle.gov/documents/departments/economicdevelopment/arena ...
is the anticipated building permit application submittal date? OVG Response: Page 5 ...
0.00219116756 |
a/56268
pioneer-square-plan
https://www.seattle.gov/documents/departments/neighborhoods/planning/plan/p ...
ballpark.lInvolve an artist on the design team to reflect the inte-gration of the stadium and Pioneer Square in the designlEnsure that the ...
0.00219116756 |
a/78415
terry-avenue-n-street-design-guidelines
https://www.seattle.gov/documents/departments/sdot/urbandesignprogram/stree ...
to be expanded and rebuilt.PurposeThe Terry Avenue North Street Design Guidelines define a master-plan concept of the street so that expected ...
0.00219116756 |
a/128909
Previous
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
Next