Filter Results

376 to 400 of 1154
sdot
investments are intended to further integrate SDOT's master plans, establish a fully connected and ...
0.001799882 |
a/63060
seattledesigncommission-2003.03.06gasworkssiteplanminutes
a master plan and subsequently Parks and Recreation did an EIS for the site. The park is in need of better ...
0.00179978542 |
a/85311
westseattle_alaskajunction_qanda
to guide needed growth – Transit Master Plan, Pedestrian Master Plan, ...
0.00179970777 |
a/54176
introduction
are directed towards increasing the number of small-scale freight mobility improvements. This revenue will also be used ...
0.001799504 |
a/61893
sfab_mtg_minutes_20200616
neighborhoodsPotential projects taken from:Modal Master Plan, Bicycle Master ...
0.0017991825 |
a/101839
bgt_feis_ch12references_web
of Transportation). 2016a. Freight Master Plan. October 3, 2016. SDOT (Seattle ...
0.0017991825 |
a/100449
spcbmplettertocitycouncil021814
previous letter, integration of the Bicycle Master Plan with other modal plans is ...
0.00179917819 |
a/109263
appendix a
speed, reliability, access, and convenience, consistent with the Transit Master Plan. Citywide $3,271 ...
0.001799141 |
a/63556
appendix_a
Improvements This program implements projects that improve transit speed, reliability, access, and convenience, consistent with the Transit ...
0.001799141 |
a/127139
context-denny-triangle
and city planner of national repute, to provide a new design for Seattle’s downtown. In 1911, Bogue proposed a master ...
0.00179910008 |
a/74335
west_seattle_lr_street_concept -_sepa checklist
for people moving through the area, align with existing and planned future neighborhood context, and accommodate the ...
0.00179875921 |
a/159696
seattle-city-council-2020-work-program
IMPLEMENTATIONMonitor SDOT delivery of projects in the Pedestrian, Bicycle, Freight, and Transit Master ...
0.00179873465 |
a/53345
lander_hazmat
in the Seattle Freight Master Plan and in the 2015 Plan to Move Seattle, ...
0.00179855491 |
a/100926
sfab_mtg_minutes_20200519
in the processCollated all proposed projects from the Freight Master Plan and the ...
0.00179841393 |
a/101837
spc_compplan_amendmentreviewfinal_comments_june0104
. Recommendation: Consider adding a policy statement as follows: “A public facility master plan will be ...
0.00179836608 |
a/108188
adopted080515meetingsummary
was made, seconded, and approved. ACTION: A motion to approve the July 8 meeting notes as amended was made, seconded, and approved. 2 ...
0.00179834443 |
a/118468
draft080515meetingsummary
on the agenda to discuss next steps regarding Parks’ Supplemental Use Guidelines. Public comment Linda Murtfeldt – Would like to voice a ...
0.00179834443 |
a/118490
2015accomplishments
in the Design Review process. Freight Master Plan The Planning ...
0.00179830077 |
a/108116
utilities_and_transportation
dropped, as their costs were higher than their benefits. Several cost-effective master planning efforts ...
0.00179818319 |
a/61046
sdot
on geographic equity and community need. All proposed budget investments are intended to further integrate the Seattle Department of ...
0.00179814815 |
a/63226
2022_levydeliveryplan
, in accordance with the Bike Master Plan. 27 Urban trail and bikeway spot improvements 10 10 No change. ...
0.00179813372 |
a/126458
9astandardspecificationsforelectricaldesign
specification to convey detailed information about a particular piece of equipment when a general section species multiple similar items. ...
0.00179796224 |
a/154294
appendix
improvements in an existing park. 0Summit AVE E/E John STK732391Golf Master Plan ImplementationThis ...
0.00179771206 |
a/62714
appendix
improvements in an existing park. 0Summit AVE E/E John STK732391Golf Master Plan ImplementationThis ...
0.00179771206 |
a/62699
accessiblemtbakerpublicoutreachreport_jan4
pavement. Along with improvements to the Hanfords steps, the project team will advocate for greenway improvements (consistent with the ...
0.00179765851 |
a/103897