Filter Results

3626 to 3650 of 11855
pspb6-2-21(0)
if SDCI determines that the Code can apply to a new building post construction. Mechanical, stair and elevators overruns ...
0.0021954237 |
a/73830
lpbminutes_1-19-22
were built, both using the Spanish Style. The house is a Category 1 building - these buildings ...
0.0021954237 |
a/133699
sepa-draft-bill_transitional-encampment-expansion
of use of any structures, buildings or premises, or any 12 part thereof, requires approval according to the procedures ...
0.00219535944 |
a/53908
lpbminutes7-1-20
Woerman stated the intent to meet Secretary of Interior Standards. He said they submerged the design as much as practical to preserve views ...
0.00219535944 |
a/163348
general_government
) builds, manages and maintains City government information technology infrastructure – radio, telephone and computer ...
0.00219535944 |
a/61194
general_government
) builds, manages and maintains City government information technology infrastructure – radio, telephone and computer ...
0.00219535944 |
a/61125
delridge-plan
, several hundred ofwhich were located all around the hills and valleys surrounding Humphry’sSettlement. John Longfellow moved to Young’s ...
0.00219535944 |
a/78398
oneseattleplanfeis-chapter02-proposalandalternatives
to stay in their neighborhoods. ▪ Climate resiliency: Reduce emissions from buildings and transportation and promote ...
0.00219535944 |
a/165712
2011attcwy2011monrpt
2011attcwy2011monrpt ATTACHMENT C CITY OF SEATTLE 2011 NPDES PHASE I MUNICIPAL STORMWATER PERMIT STORMWATER MONITORING ...
0.00219535944 |
a/112588
nfpa130amendments2012sfc
shall be permitted in accordance with ((NFPA 101)) Chapter 10 of the 2012 Seattle Building Code and shall ...
0.002195354 |
a/64235
1designprocessfinalredacted
project that requires complete closure of a critical arterial roadway will be more expensive to build, more impactful to ...
0.002195354 |
a/154255
10ic-scada-finalredacted
and design resources. Chapter 10 I&C (SCADA) 10-6 SPU Design Standards and Guidelines Chapter Owner: Thuy Hoang February 2024 10.2.1 SPU ...
0.002195354 |
a/154302
2012sbcappendixd
. Within the firedistrict every building hereafter erected shall be either Type I,II, III or IV, except as ...
0.00219524349 |
a/97330
2012seattlefirechapter4
to the fire department.401.4 Required plan implementation. In the event anunwanted fire is detected in a building or a fire ...
0.00219524349 |
a/97591
2021codessignificantchangessummary
Codes A [W] indicates the change is a significant Washington State code change. A [S] indicates a significant Seattle amendment: 2021 ...
0.00219524349 |
a/159295
seattledesigncommission-2008.10.161200stewartminutes
benefit amenity. § The proposed improvement design is consistent with the DPD Denny Way vision and integrates to this project well. § In ...
0.00219524349 |
a/85455
directors_report_mha_chinatownid_implementation
building permits. The City created several different scenarios for capturing the relationship between ...
0.00219524349 |
a/65075
uw-annual-report-2022
of the annual report, two sites have been under construction by the University of Washington: S40 (Health Sciences Education ...
0.00219524349 |
a/130971
dr 7-2009
deficiencies found. The proposed solutions are permitted to be conceptual only. Minimum design forces used for analysis ...
0.00219524349 |
a/174942
nwhannualreport2019
▪ McMurray Building – Minor – 10/00 ▪ Street Improvements Related to Future Development – Minor – 7/01 ▪ Elimination of ...
0.002195199 |
a/76910
annualreport2017
- 9/00 ▪ Garage Addition – Minor – 10/00 ▪ McMurray Building – Minor – 10/00 ▪ Street Improvements Related to Future ...
0.002195199 |
a/76879
2018_19 annual report final
Accelerator Addition – Exempted – 6/99 ▪ Emergency Department and Main Lobby – Exempted - 8/00 ▪ MRI Addition - Exempted - 9/00 ▪ Garage ...
0.002195199 |
a/76878
2020-2021 annual report_final
Office Building, which currently flows off the site uncontrolled. under garage, was reviewed and approved through the City ...
0.002195199 |
a/135426
smcfirsthillmp2013
requirements via and Administrative Conditional Use Permit approved as part of the Master Use Permit for a ...
0.002195199 |
a/77662
duwamish-matrix
and $10,000 from the Port of Seattle.Safeco Field Neighborhood Impact FundsAs a result of conditions on the Safeco Field street vacation ...
0.002195199 |
a/78363