Filter Results

3551 to 3575 of 11817
ch8
to the west (Figure 8-1). For the portions of the study area bounded by a street, the study area includes the entire street. This area, ...
0.00212918548 |
a/100495
rapidride roosevelt suppea
loading zone and shuttle loading zone nearby, where feasible, to facilitate passenger pick-up and drop-off for nearby ...
0.00212918548 |
a/106328
nwh annualreport2005
# of carpool permits issued each month: 60 10 20. Average # of carpool participants each month who work in your ...
0.0021291452 |
a/76906
sdot_street_use_permit_fee_schedule
Building Program, be capable of achieving Leadership in Energy and Environmental Design (LEED) platinum certification, or ...
0.0021291452 |
a/104536
neighborhoodplanningelement2015replacementpages
of the community in need of such services, especially youth.CA-P41 Build strong partnerships and support projects that ...
0.0021291452 |
a/87609
sdot_street_use_permit_fee_schedule
Building Program, be capable of achieving Leadership in Energy and Environmental Design (LEED) platinum certification, or ...
0.0021291452 |
a/104741
oh2_meeting_summary
Is Contrary to the City's Agreement and Permits for the Elliott Bay Marina Our privacy and safety were issues which, in ...
0.002129068 |
a/101181
draftufcmeetingnotes061522
property? 5 Yes Wrapped into building permit No Two-week advance notice of application to remove tree ...
0.002129067 |
a/130975
ufcmeetingnotes061522
Rule Permits required for developers removing significant trees on private property? 5 Yes Wrapped into ...
0.002129067 |
a/131178
general_government
) builds, manages, and maintains City government information technology infrastructure – radio, telephone, and computer ...
0.00212906348 |
a/60904
appendix
improvements in an existing park. 0Summit AVE E/E John STK732391Golf Master Plan ImplementationThis project includes new driving ranges, ...
0.00212906348 |
a/62714
appendix
improvements in an existing park. 0Summit AVE E/E John STK732391Golf Master Plan ImplementationThis project includes new driving ranges, ...
0.00212906348 |
a/62699
bgt_feis_ch01_web
the screening criteria and does not result in more intersection crossings than the Ballard Avenue or Leary Alternatives. Ultimately, after ...
0.00212906348 |
a/100438
mha_principles_fg_inputsummary_v7
of housing doesn’t leave room for these extra rules. Permit lots more housing so we can afford to be picky about how it’s ...
0.00212906348 |
a/64823
lpb022423leamingtonpacificbp
APARTMENTS317 MARION STREETSEATTLE, WA 9810402INTRODUCTIONPLYMOUTH HOUSING & PACIFIC APARTMENTSThe Pacific Apartment ...
0.00212906348 |
a/138931
hrs_kc_2018
journey and lays out 10 Actions necessary to move forward. Associated media can be found at http://hrs.kc.future.com/. In 2019, dozens of ...
0.00212906348 |
a/53377
ucuv growth report 3q 2021
%35,0002,804N/A5,2364,4035,3932,5653,084Tuesday, November 23, 2021Page 1 of 4** Built Housing Units are the net new units (new units built ...
0.00212904741 |
a/84305
ucuv_growth_report
units (new units built minus units demolished) reported in the year the building construction permit was ...
0.00212904741 |
a/84310
ucuv_growth_report
05, 2018Page 1 of 4** Built Housing Units are the net new units (new units built minus units demolished) reported in the year the ...
0.00212904741 |
a/84177
seattledesigncommissionhandbook
• Seattle Department of Construction and Inspection (SDCI) project number, if available• Seattle Department of Transportation (SDOT) Street ...
0.00212904741 |
a/85851
notes20170419
Major Institutions uses outright, however, if any other entity would come in and build a school in the ...
0.00212902 |
a/77186
2012sfgcchapter3
are permitted to be locatedbelow the elevation required by Section 1612 of the Inter-national Building ...
0.00212902 |
a/97179
exhibit3ordinance126113interimregulations
, camping, travel, or seasonal use. 21 ((P.)) "Start of construction" means and includes substantial improvement, and means the 22 date the ...
0.00212902 |
a/96808
2018sbcchapter25
2018sbcchapter25 2018 SEATTLE BUILDING CODE733CHAPTER 25GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTERUser notes:About ...
0.00212899945 |
a/97438
front_end
Processing Times. The recent boom in construction has led to delays in processing building-related ...
0.00212899945 |
a/61060