Filter Results

3376 to 3400 of 12214
lpb11-4-20
who has experience with historic buildings there. He said various options for the building have been ...
0.00218632631 |
a/74640
seattle_city_light
. The $7.7 million budget for the Utility Support Budget Control Level includes 7 projects that preserve and improve ...
0.00218632631 |
a/61139
protec17 main executive cba 23-26 cba final clean w links
opportunity and building a workforce that reflects the whole community and creates a diverse workforce. The City and the ...
0.00218632631 |
a/158777
2009attachmentc-wy2009monitoringreport
2009attachmentc-wy2009monitoringreport ATTACHMENT C CITY OF SEATTLE 2009 NPDES PHASE I MUNICIPAL STORMWATER PERMIT ...
0.00218632631 |
a/113430
1005_s_king_plan_set
-LEVEL PERSPECTIVESIllustrative Conceptual DesignNOTE: THESE DRAWINGS ARE INTENDED TO DEPICT BULK/MASSING/SCALE. They were originally done ...
0.00218632631 |
a/73284
lpb7-20-16_minutes
for demolition. Ms. Sodt said she understands they are close to issuing a demolition permit. Ms. Patterson said they have ...
0.00218624971 |
a/74685
2018annualwastewatercollectionsystemreport
................................................................................................. 1 1.2 Collection System NPDES ...
0.00218624971 |
a/114380
02-28-08
beyond those found in the two base zones; Single Family 7200 and Lowrise 3. Parks is requesting amendments that will support ...
0.00218624971 |
a/92034
cb-118736-cs-memo-8.2.2016
is not required, from the date of the final building permit inspection, for the development to which this ...
0.00218623783 |
a/53222
adoptedufcmeetingnotes040523
of existing trees with adequate space for trees to grow and survive. 10. Require a Tree Inventory of all trees 6” DBH and larger and a Tree ...
0.00218623783 |
a/143111
central-staff-memo-on-amendments-(added-071916)
building permit inspection, for the development to which this Chapter 23.58C applies according to ...
0.00218623783 |
a/53223
draftufcmeetingnotes040523
building permits being approved. 11. Extend ordinance to cover all land use zones, including Industrial, ...
0.00218623783 |
a/142123
2017.02.28-key arena-concept-narrative.mechanical
. In the case of discrepancy between this narrative and the architectural drawings, request clarification from the Engineer. C. All ...
0.00218623155 |
a/56256
sdot_birt_report_appendices_110220
.............................................................. 3 Figure A-4 Ballard to Downtown Seattle Transit Expansion Study Area ...
0.00218623155 |
a/103975
2012sebcchapter7
of theInternational Building Code is permitted. The family orassisted-use toilet or bathing room shall be ...
0.002186202 |
a/97121
pspb0504_bb_sr
building, or any portion of a building, structure or lot in a special review district, and no ...
0.00218612584 |
a/127731
seattle_public_utilities
, permitting, property acquisition, design, construction, and purchase of facility equipment. Project Selection Process SPU ...
0.00218612584 |
a/61794
23rdavecorridorsepachecklist
. No, there are no known applications pending for government approvals of other proposals directly affecting the property covered by this ...
0.00218612584 |
a/102742
utilities
of combined sewers • 68 pump stations • 92 permitted combined sewer overflow outfalls • 342 storm drain outfalls • 130 ...
0.00218612584 |
a/61807
lpb101624bleitzpp
and is actively developing design and permit documents for the space.As a part of this new tenancy, a playground will be ...
0.00218612584 |
a/161388
lpb101124bleitzpp
and is actively developing design and permit documents for the space.As a part of this new tenancy, a playground will be ...
0.00218612584 |
a/161257
2018smcchapter4
2018smcchapter4 2018 SEATTLE MECHANICAL CODE39CHAPTER 4 VENTILATIONUser note:About this chapter: Chapter 4 intends to provide an indoor ...
0.00218599173 |
a/97276
finaltollingstudyreportrevised6.25.10
throughout the region to maximize the use of the entire road network– and to minimize diversion from tolled to un-tolled facilities.  ...
0.00218599173 |
a/99427
09-12-02
with Alternative #2. This option compromises both creek and athletic uses but achieves the intent of the project. ...
0.00218599173 |
a/91923
09-26-02
with Alternative #2. This option compromises both creek and athletic uses but achieves the intent of the project. ...
0.00218599173 |
a/91924