Filter Results

3351 to 3375 of 11838
spufinal2019_wsp_volume2-parta
, aerators, and clothes washers. As old fixtures and appliances are replaced with new ones in existing buildings and new ...
0.00213139225 |
a/113235
psbminutes9-20-17
. Messrs. Kralios and Alsobrook abstained. 092017.2 APPLICATIONS FOR CERTIFICATES OF APPROVAL 092017.21 Squire ...
0.00213137968 |
a/73819
copyofnorthgateudffinal
65 Parks and Public Amenities 67 Land Uses and Building Design ...
0.00213137968 |
a/87269
lander_nepa_categoricalexclusion
particularly with permitting agencies. 4. Representative photographs of the Project area. I. PROJECT DESCRIPTION Project ...
0.00213137129 |
a/100928
adrule27.01.22_v1_marine_terminals_proposed_for_12122023_12-29
for propulsion of the vehicle upon which it is mounted. CONTAINER FREIGHT STATION is any building located on, or within, a ...
0.00213136524 |
a/151368
cap by 2015 actions status report master
, with completion anticipated in 2016. Continue improving permitting processes to promote the most sustainable ...
0.00213136314 |
a/88253
capdetailedstatusreportfeb2015
efficiency policies and programs, with completion anticipated in 2016. 1BFGLBuilding Energy11121314Continue improving ...
0.00213136314 |
a/88258
park-use-permit-put-the arts-in-parks
and welcoming opportunities to play, learn, contemplate and build community. Introduction Thank you for choosing a Seattle ...
0.00213136314 |
a/49402
aip park use permit application 2019
aip park use permit application 2019 Seattle Parks and Recreation will work with all citizens to be good stewards of our ...
0.00213136314 |
a/49386
lander_noise
SMC 23.50.014, the only residential use allowed in study area zoning designations is live-work artist studios, which are ...
0.00213136314 |
a/100929
seattle_public_utilities
drains • 1,000 miles of combined sewers • 768 pump stations • 93 permitted combined sewer overflow outfalls • 277 storm ...
0.00213134056 |
a/61208
2025interimstreetactivationordinancesdci
indicating that, based on the Master 7 Use Permit plans, the operator has determined that the development could meet the ...
0.00213134056 |
a/167708
2018secappendixd
(such as rectangle, L shape, H Shape, U shape or T shape) to represent blocks. Whereactual building shape does not match ...
0.0021313373 |
a/97518
annualreport2019
of City Council Condition#5. South Seattle College 2018 Major Institution Master Plan Status Update Report Page 6 of 9 application for any ...
0.0021313373 |
a/77328
adoptedufcmeetingnotes020922
with the feedback received and the need to gather more 4 data. The other strategy not moving forward at this point was to require a tree ...
0.0021313373 |
a/140417
draftufcmeetingnotes020922
of the recommendations with the feedback received and the need to gather more data. The other strategy not moving forward at this point was ...
0.0021313373 |
a/119231
georgetown-matrix
..........................................................................................................E. Code Enforcement and ...
0.002131308 |
a/78367
permanentfloodplainordinance
, or seasonal use. 2 ((P.)) "Start of construction" means and includes substantial improvement, and means the 3 date the ...
0.002131308 |
a/148485
opcdincentivezoningamenitystandards
of the Land Use Code and these Standards. 2. Building Permit. Prior to issuance of the first ...
0.00213125627 |
a/87101
2025_indoor_brochure
, Building 30, Seattle, WA 98115Capacity 1300* - *Weather permitting, the large garage doors can open at ...
0.00213125627 |
a/152033
2025 indoor brochure
NE 74th Street, Building 30, Seattle, WA 981151300* - *Weather permitting, the large garage doors can open ...
0.00213125627 |
a/164009
8drainagewastewaterfinalredacted
and within 18 inches of the building foundation. combined sewer Public Combined Sewers are publicly owned and maintained ...
0.00213125627 |
a/154291
2012smcchapter4
floorcovering, or other similar means where permitted bythe International Building Code. The mechanical ...
0.00213120156 |
a/97233
annualreport2013
. That method, sometimes referred to as “design-bid-build,” was required for all public works construction regard-less of s ...
0.00213120156 |
a/50252
seattle_public_utilities
, permitting, property acquisition, design, construction, and purchase of facility equipment. Project Selection Process SPU ...
0.00213119015 |
a/61649