Search Results
Results
3101 to 3125 of 11090
- seawallbuildingaresilientseattleeconomy2026 cities, and also found no significantemployment loss. They also partially agree with Vigdor on hours worked – their methodology did not ... 0.003493614 | | a/184611
- psb080223railspurpp Preservation Board to create a thoughtful and effective activation strategy. Activated alleys are nothing new to Seattle. The Alliance for ... 0.003493614 | | a/145052
- wmbe-goals-2014 detailed WMBE utilization information and allow divisions to set their own purchasing goals to increase ... 0.003492783 | | a/99828
- draftufcrecommendationstreeprotectionsbill040523 and replacement over time by establishing improved data collection and accountability through Commercial Tree Work reporting requirements; ... 0.003492783 | | a/140748
- seattlebondcounselrfp waste utilities (“Bond Counsel”). The initial term of the engagement will be for two years with an option to extend for an ... 0.003492783 | | a/50521
- draftufcrecommendationstreeprotectionsbill040723 to maximize the resiliency and benefits of nature within our urban environment by protecting and enhancing our green infrastructure. c. ... 0.003492783 | | a/140772
- 4water 4water Seattle Public Utilities Water SPU – Water 2014-2019 Proposed Capital Improvement Program Overview SPU delivers an ... 0.003492783 | | a/62180
- introduction_000 Library, Seattle Department of Transportation, Seattle City Light, Seattle Public Utilities (divided into four sections: ... 0.003492783 | | a/61910
- introduction Library, Seattle Department of Transportation, Seattle City Light, Seattle Public Utilities (divided into four sections: ... 0.003492783 | | a/61921
- seattledesigncommission-2016.06.0220205thaveskybridgeminutes as a pedestrian connection between the Westin Building and 2020 5th Ave. The approval did not include the addition of ... 0.003492783 | | a/85802
- introduction Library, Seattle Department of Transportation, Seattle City Light, Seattle Public Utilities (divided into four sections: ... 0.003492783 | | a/61909
- draft-aduleg_050919 dwelling units and 16 backyard cottages by removing the parking requirement, removing the owner-occupancy 17 requirement, ... 0.003492783 | | a/54470
- dwf-2017-moodys-report allows the utility to pass through countywastewater treatment charges based on adopted wholesale rates and ... 0.003492783 | | a/58405
- strategic-business-plan_executive-summary_ 2021-2026 strategic-business-plan_executive-summary_ 2021-2026 DELIVERING THE ESSENTIALSEvery day, Seattle Public Utilities delivers ... 0.003492783 | | a/112197
- mastec_set_2 CONSULTING INC.15586-023-E PERMIT #:421117515 2ND AVESEATTLE, WA 98104CONFIDENTIAL/PROPRIETARYSHEET: OF 127 SHEETS ... 0.003492783 | | a/74167
- spu_sharedtech spu_sharedtech Seattle Public Utilities Shared & Technology Projects 565566¹Funds are appropriated through the Adopted ... 0.0034917288 | | a/127123
- 4-5_utilities_adu_deis_2018 4-5_utilities_adu_deis_2018 This section analyzes the potential impacts to public services and utilities from the Land Use ... 0.0034917288 | | a/53177
- parks to assist the Department with the impact of utility cost increases. This amount is transferred from the reserves for ... 0.0034917288 | | a/60435
- treeregsconstitutentemailsthrough121020 ” to ”Tree Protection Areas”. • SECTION 4. Add “The Director shall have the authority to allow replacement trees on both ... 0.0034917288 | | a/119501
- 2027-2032stratplan workforce for evolving energy needs, and improving customer service.City Light is here to serve, not make a profit. As a public ... 0.0034917288 | | a/183303
- 2019_avalon_aac_sepa_checklist_9-25-18 by Seattle Public Utilities for the watermain replacement work on 35th Ave SW. 2019 SW Avalon Way and 35th Ave SW Paving ... 0.00349021214 | | a/102874
- 2023-06-22 order of summ. j. ; intersection stop controls; drainage catch basins and culverts; drainage pipe and inlets; road pavement, including driveway connections; ... 0.00349021214 | | a/144846
- 2023-2028-scl-stratplan-appendices a year while the Utility focused on COVID-19 related issues in 2020. This update realigns strategic planning with the ... 0.00349021214 | | a/132401
- sdot 2019 wmbe outreach plan . in 2018 7 Large Projects/Purchases SDOT continues to explore unbundling strategies to allow WMBE opportunity on large ... 0.00349021214 | | a/99773
- spu_mimp_annual_report_july_2019-june 2020 decision & MUP Decision for the University Center was issued by DPD. On October 31, 2013 a minor amendment was requested for the Wallace ... 0.00349021214 | | a/77234