Filter Results

2826 to 2850 of 10108
pikepinesepachecklist
the Design Review Board. 5. Exclude street level floor area in characters structures that are retained as part of a new ...
0.00177762075 |
a/87333
lpbcurrentnom_mittelstadtmortuary
Ernest was listed as the owner on the 1923, 1924, and 1928 building permits for the mortuary, and indicated that he was ...
0.00177750376 |
a/74509
seattledesigncommission-2005.07.21seattlecentergarageminutes
. Box 34019 700 5th Avenue, 19th Floor Seattle, WA 98124-4019 phone 206/233-7911 fax 206/288-7883 printed on recycled paper 21 July ...
0.00177749177 |
a/85364
finalreport-122015
to the City of Seattle Municipal Code (SMC 23.44.17 and 23.79). The intent and purpose of this report is to document public testimony and ...
0.00177740993 |
a/76816
ohaffordablehousingomnibusdns
the proposal may aid in permitting process efficiency for all types of low-income and affordable housing, it is unlikely to ...
0.00177740154 |
a/141192
cai-oed-coal-train-economic-impacts-final-2013-0813
Valley may possibly be affected by more rail traffic (though they would likely use the Spokane Street ...
0.00177739235 |
a/56153
lpbcurrentnom_roy vue_landmark nomination_081718
. It's questionable if the tree is 94 years old, however. Often used as a street tree in mid-century ...
0.00177738932 |
a/74533
sdot low bridge access policy final (1)
the cameras for limited new uses including those mentioned above. SPOKANE STREET SWING BRIDGE (LOW ...
0.0017773353 |
a/101481
20130207finalreportreqrepost20140428
ensure full implementation of the Construction Coordination and Mapping Tool. Implemented February 2010 143 SDOT should develop a policy ...
0.0017773289 |
a/50555
lpbcurrentnom_sheridan
: 065900-1015 Legal Description: Block 16, Lot 11, Heirs of Sarah A. Bell's addition, less portion for the street Date ...
0.00177732611 |
a/74539
fh_mimp_2022 annual report_final
is anticipated to commence upon receipt of all required permit approvals. List of conditions and status of fulfillment ...
0.00177731947 |
a/139534
delridgeevansschoolreportfinal
’ decisions to use transit.72 Barriers include cleanliness and transit stops that are located in unsafe locations, such as ...
0.00177729793 |
a/86690
mayor harrell's one seattle housing agenda
is available until November 2026. More than 3,000 distinct projects are eligible and have the potential to add 34,000 housing units. Through ...
0.0017772885 |
a/174116
2025-07-07 deliberative housing draft v6
are eligible and have the potential to add 34,000 housing units. Through Master Use Permit Extensions ...
0.0017772885 |
a/174182
esa_northgate_final_081518
. • The western 400 feet of the pedestrian and bicycle corridor will connect to College Way N and vacated N 100th Street ...
0.00177723949 |
a/100847
2025_annual_property report_data
. Water District 125 has expressed interest in buying the property from SPU to construct a pumping station for water conveyance. Although ...
0.00177714194 |
a/167860
2017_0418_fauntleroy_walk_and_talk_summary_final_v2
is that median doesn't serve as a way point for scofflaws that will cross mid-block using the median as a way point. This ...
0.00177713658 |
a/100540
lpbcurrentnom_campbell_building
characterized by distinct upper and lower zones reflecting differences in the use of interior spaces. In a two-part ...
0.00177711272 |
a/74440
seattle_public_utilities
for six travel lanes and a bicycle/pedestrian shared-use path between Dexter Ave and 5th Ave North. Roy ...
0.0017770906 |
a/61713
spu_drainage_wastewater_projects
, planners, and management. This data will be used to assist in capacity planning, validating repairs, assessing new ...
0.00177703029 |
a/61330
lpbcurrentnom_showbox_historic_seattle
of the bar and entrance passageway greatly expanded the reception area for the venue. To facilitate directional reference due to a slight ...
0.00177698466 |
a/74540
2024 rtcc sir final
. • Notification of the technology being used will be shared with the neighborhoods where it is deployed through community ...
0.00177697721 |
a/157429
2021sfgcchapter4
be used as the basis for pipe sizing, assuming that all appliances could be operating at full capacity simultaneously. ...
0.0017769672 |
a/162661
psb12-16-15_minutes
; to return unproductive structures to useful purposes; to attract visitors to the City; to avoid a proliferation of ...
0.00177696522 |
a/73753
lander_nepa_categoricalexclusion
applicable state and local permit requirements during Project construction. Local requirements may include a ...
0.00177694 |
a/100928