Search Results
Results
2751 to 2775 of 11215
- draftoneseattleplan-spc-commentletter-final-042524-letterhead of displacement areas of Neighborhood Residential zones which would in practice allow only three units on a standard 5,000 ... 0.0036040633 | | a/155703
- lhes combined comment letters coverage from 35 to 50%, not allowed by city code. Building that is taller then code allows, 60ft as ... 0.0036040633 | | a/76818
- march_2004_city_of_seattle_economic_update levies the Utility rate of 6% on the provision of telephone services and the B&O rate of 0.415% on the providers of ... 0.003602317 | | a/63933
- march_2004_city_of_seattle_economic_update(0) levies the Utility rate of 6% on the provision of telephone services and the B&O rate of 0.415% on the providers of ... 0.003602317 | | a/63932
- mbrt final readiness review sent to fta 6-26-20 not contain sufficient schedule contingency to meet FTA OP-40 requirements. These results were shared with the Sponsor, who asked that ... 0.003602317 | | a/106196
- mbrt_final_readinessreview schedule contingency to meet FTA OP-40 requirements. These results were shared with the Sponsor, who asked that because King County Metro ... 0.003602317 | | a/106198
- appd_mha_deis_2017 , housing and socioeconomics, aesthetics and height/bulk/scale, historic resources, open space and recreation, transportation, public ... 0.003602317 | | a/65015
- appd_mha_feis_2017 , housing and socioeconomics, aesthetics and height/bulk/scale, historic resources, open space and recreation, transportation, public ... 0.003602317 | | a/65055
- seattledesigncommission-2005.01.06mlkjrmemorialparkminutes of the buildings that must be carefully programmed. Placing the road in the middle of the right of way allows the most ... 0.003602317 | | a/85352
- accessible_mtbaker_multimodal_plan_12_05_16 made in the area will be utilized to their full potential. The Plan will reconfigure the intersection of Rainier Ave South ... 0.003602317 | | a/103898
- accessible_mtbaker_multimodal_plan_12_05_16 made in the area will be utilized to their full potential. The Plan will reconfigure the intersection of Rainier Ave South ... 0.003602317 | | a/99118
- 2018_2022_pmp_implemplan_v13 • A summary of pedestrian-related initiatives• Cost-sharing opportunities with utilities and private investmentAs part of ... 0.003602317 | | a/99322
- alignstudy_final % was used as the maximum allowable roadway grade. In addition, a bridge crossing rail lines was assumed to have 5 feet of ... 0.003602317 | | a/101016
- appxc_alignstudy % was used as the maximum allowable roadway grade. In addition, a bridge crossing rail lines was assumed to have 5 feet of ... 0.003602317 | | a/101038
- context-city-owned-buildings p. 24Seattle Fire Department p. 27Seattle Public ... 0.00360126654 | | a/74333
- sdot low bridge access policy final (1) the types of trips and vehicles allowed to cross the low bridge has evolved as SDOT and the Seattle Department of ... 0.00360126654 | | a/101481
- policyrecommendationsreport20092010 , is setting up a series of innovative “Living Room Forums” to allow for small group discussions about public safety ... 0.00360126654 | | a/83747
- 2026swmanualapxgoperationmaintenance ; does not allow maintenance access; or interferes with maintenance activity. If trees are not a threat to dam, berm, or ... 0.00360126654 | | a/181126
- 2-0descrofalts121814 and homes should be located, how to improve the transportation system, and how to prioritize investment in public facilities, such as ... 0.00360126654 | | a/87752
- psb121025prefontainfountainpp MOSAICNotes:- Colorbody Porcelain utilizes color throughout the entire tile body to help disguise chips.- Hexagon shape ... 0.00360126654 | | a/175637
- psb121725prefontaineppupdated PLAN -PHASE 1 IMPROVEMENTSPREFERRED DESIGN VISIONL-001######1/8"=1'-0"DEMOLITION ANDSALVAGE PLANALSO, VERIFY ALL UNDERGROUND ... 0.00360126654 | | a/175963
- dpr_projects includes a pump and retention vault which will allow for a new sewer system to be activated at a future time when ... 0.00359471235 | | a/61250
- dpr_projects and access path, improves the drainage system of the comfort station, and implements other improvements. The new comfort station includes a ... 0.00359471235 | | a/61306
- outlineanddraftufctreeprotectionregs070219fulldoc inches 4 tree units 4X For every 6 inches DSH over 24” add 2 tree units 2X 25.11.130 Development standard departures for tree preservation ... 0.00359471235 | | a/119460
- outlineanddraftufctreeandurbanforestprotectionordinance070219full ... inches 3 tree units 3X 18 - 23.99 inches 4 tree units 4X For every 6 inches DSH over 24” add 2 tree units 2X 25.11.130 Development standard ... 0.00359471235 | | a/119418