Filter Results

2551 to 2575 of 12213
2020_11_28-report_base-screen
of the Build Art Space Equitably (BASE) program responded to the needs that the City has heard from within communities of ...
0.00219818833 |
a/49633
financial-statements-federal-single-audit-2005
of that audit will be included in a separately issued accountability report. Sincerely, BRIAN SONNTAG, CGFM STATE AUDITOR Washington ...
0.00219816738 |
a/58366
ffd
Facilities and Emergency Response Levy by Seattle voters in November 2003, this project expands the building while ...
0.00219813338 |
a/60543
isrd92221237jacksonbp
OF CONTENTS PROJECT INFORMATION p.05 HISTORICAL CONTEXT p.06 NEIGHBORHOOD CONTEXT p.07 NEIGHBORHOOD ARCHITECTURE p.08 ...
0.00219813338 |
a/131558
adoptedufcmeetingnotes113022
of all trees 6” DBH and larger and a Tree Landscaping Plan prior to any building permits being approved. ...
0.00219812687 |
a/136778
uwannualsemireportaugust2004
reported to UW Application date Status per online permitting data 4707 12th Ave. NE January 2004 8/21/2002 Project 2205331 ...
0.00219809148 |
a/77879
desrptfranklin apartments
characteristics of an architectural style, or period, or a method of construction. DESCRIPTION The Franklin Apartments ...
0.00219803932 |
a/76046
seattledesigncommission-2003.01.16jointtrainingfacilityminutes
Storage Building Project Terry Avenue Street Design Terry Avenue Plaza/Schnitzer Development NW Bergen Place Park ...
0.00219803932 |
a/85308
preservation-guide
Furniture, Fixtures, Equipment 50,000 - Soft Costs Development Costs Energy Audit 5,000 5,000 Environmental Study (Level I, ...
0.00219803932 |
a/67741
pspbminutes3-7-18
building, or any portion of a building, …unless a certificate of approval has been issued by the ...
0.00219802628 |
a/74068
financial-statements-federal-single-audit-2006
franchise fees and street use permit fees. Revenues for various recreational activities and concessions increased as did ...
0.00219799113 |
a/58367
2012sbcchapter19
concrete containing light-weight aggregates. If approved by the building official,Table 1905.1.11 is ...
0.00219796039 |
a/97350
cooper-house-designation
. It is not known whether Mr. Childs had any plans for building on the property, but he sold it to John O. Cooper sometime ...
0.00219796016 |
a/75861
desrptcooperhouse
. It is not known whether Mr. Childs had any plans for building on the property, but he sold it to John O. Cooper sometime ...
0.00219796016 |
a/75959
1998solidwasteplan
issues common carrierpermits to commercial recycling haulers.¥ Seattle Department of Construction and Land Use (DCLU).Issues land use and ...
0.002197958 |
a/112454
pspbminutes_10-5-22
types of occupied rooftop penthouse uses are permitted as a rooftop feature of a new building, or as a ...
0.002197949 |
a/139594
lpbcurrentnom_inouyel
......................................................................................................................... A-20 Figure 34 • ...
0.002197949 |
a/74488
dr2020-6 bicycle parking guidelines
installation of standard rackBicycle Rack Permit Process• The applicant must show the location of bike racks in relation to ...
0.00219784817 |
a/99176
sdot bicycle parking guidelines (2020)
to coordinate installation of standard rackBicycle Rack Permit Process• The applicant must show the location of bike racks ...
0.00219784817 |
a/100205
adoptedufcmeetingnotes081722
trees 6” DBH and larger and a Tree Landscaping Plan prior to any building permits being approved. 11. ...
0.00219784817 |
a/134739
cf-307560-0601
Current annual permit or proximity cardholders will be accommodated as priorities allow. A waiting list for vehicle parking ...
0.002197791 |
a/136963
isrd021125_800maynardps
STORY OFFICE BUILDING TO SELF STORAGE FACILITYNET LOT AREA27,360 SFZONINGIDM 165/85-170OVERLAYSINTERNATIONAL SPECIAL REVIEW ...
0.002197791 |
a/165294
treeregsconstitutentemailsthrough110719
. How many building permits are not reviewed for trees on-site by city arborists? Can we audit this ...
0.00219776761 |
a/119499
7901-t
on structures undergoing construction or on the roof of a building only when authorized by a separate temporary (7901-T) ...
0.002197734 |
a/64075
psb112823firstmodesr
of a building is not permitted, except when it is proposed as part of an overall integrated sign plan for ...
0.00219770661 |
a/149974
Previous 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 Next