Filter Results

1026 to 1050 of 1811
seattleindustriallandsindustrialdevelopmenttypesmemodraft2020
in one-off fabrication and reach wider audiences, including startups and entrepreneurs. • There may be a role for ...
0.00215056958 |
a/87170
lpb5-6-15-minutes
corner as will their signage and artifacts. Responding to questions Mr. Donegan said that there will be a finger or had ...
0.00215056958 |
a/74674
schoenfeld-building-designation
masonry including the tiny shadow of a painted wall sign is visible. The greatest alteration to the principal First Avenue ...
0.00215056958 |
a/76521
desrptschoenfeldbldg
including the tiny shadow of a painted wall sign is visible. The greatest alteration to the principal First Avenue ...
0.00215056958 |
a/76232
africanamericanworkshopnotesmarch2009
Fabric store • Fred Myer with bank • Art supply store • Old chubby and tubby site • ...
0.00215056958 |
a/88077
africanamericancommunityworkshopnotesmarch2009
, private • Fabric store • Fred Myer with bank • Art supply store • Old chubby and tubby site • ...
0.00215056958 |
a/88036
desrptseattlemonorail
of urban transit, happily accepted Alweg’s no cost offer to construct a monorail for the Seattle World’s Fair. Construction contracts were ...
0.00215056958 |
a/76246
seattle-monorail-designation
of urban transit, happily accepted Alweg’s no cost offer to construct a monorail for the Seattle World’s Fair. Construction contracts were ...
0.00215056958 |
a/76533
idminutes8-28-18
Applicant: Kevin Park, Signs of Seattle Ms. Sodt explained the application for proposed replacement of the awning ...
0.00215056958 |
a/73157
lpbminutes7-5-17
at the existing/original entry/ it will become a walk-up coffee window. Color samples and material specs were provided. ...
0.00215056958 |
a/75046
lpbminutes4-3-19
about a second proposed building addition. She explained the proposed signs and indicated locations. Address numbers are ...
0.00215056958 |
a/75027
lpbminutes6-5-19
: There was no public comment. Board Deliberation: Mr. Freitas said ARC noted durability concerns with interventions against historic ...
0.00215056958 |
a/75040
adrule26.01.14
, pipe shop, welding shop, fabricating shop and subassembly areas on the vessel or at the shore facility established for ...
0.00215056958 |
a/64111
adrule26.01.24
, pipe shop, welding shop, fabricating shop and subassembly areas on the vessel or at the shore facility established for ...
0.00215056958 |
a/153897
cdwacwsacnotes71217finalapprovedbycommittee
attendees to sign-in. • Committee Members, SPU staff, and guests introduced themselves. • Meeting notes from June were ...
0.00215056958 |
a/111072
2017opa-1312ccs06-24-18
recalled that NE#3 told him with a smirk, “wait ‘til your command hears about tonight.” The Complainant told OPA that the Named Employees ...
0.00215056958 |
a/82185
26.01.24_proposed_changes_after_fcab_jan 9_meeting
section, pipe shop, welding shop, fabricating shop and subassembly areas on the vessel or at the shore facility established ...
0.00215056958 |
a/151955
26.01.24_proposed_changes_v4after_meeting
or contains flammable or toxic materials or physical hazards. Designated area. An area such as a vessel section, pipe shop, welding shop, ...
0.00215056958 |
a/151366
seattledesigncommission-2009.04.16seattletradecenterskybridgeminu ...
you are doing is great, but coming up with something that is easily fabricated is great, but you should work with City ...
0.00215056958 |
a/85476
23rdavenueactionplanphase2draftstrategies
with Unique Identity - The Central Area is a neighborhood that requires you to believe in it. It is an inclusive multicultural ...
0.00215056958 |
a/86192
2021-2025_ddwa_l77_booklet
device(s) fabricated to help prevent potentially harmful oral health habits (e.g., chronic thumb sucking appliance, tongue ...
0.00215056958 |
a/68042
3designconstructionfinalredacted
in Seattle the inlet structure is too small (see Inlet type 164 and look for them in the field) to use a manufactured filter sock with an ...
0.00215056958 |
a/154269
q2 2023 levy to move seattle report
signs, leading pedestrian intervals, and reflective signal heads; installed improvements on 4th Ave S between S Holgate St ...
0.00215056958 |
a/145689
1997wsdot_spr_i-90-corridormaintenanceagreement
that is the subject of the review consistent with the provisions of this Agreement by the signing of the WSDOT ...
0.00215056958 |
a/72562
pedretailareassepadirectorsreportandrecommendation
who signed up for the list serve on the project website or at a community meeting where DPD presented on the project. Over ...
0.00215056958 |
a/88127