Seattle Center Arena

Review Status

On May 3, 2018, we reviewed the updated concept design for the Seattle Center Arena Development. This was our third review of the project. At this meeting we did not take an action, but provided the project team with several recommendations that should be addessed prior to the next meeting.

Project Description

The project team is proposing to redevelop the existing arena located within Seattle Center for existing and future professional sports team, other sporting events, concerts, and shows.  The redevelopment site includes the area surrounding the existing arena as well as the block bounded by 1st Ave N, Thomas St, Warren Ave, and John St. The existing arena, which is a designated landmark, will be expanded below grade to increase overall seating capacity.  The loading area along Thomas St. will be redeveloped into an atrium and pedestrian plaza with parking and loading services located below grade.

May 3, 2018

January 18, 2018

October 5, 2017