Queen Anne Boulevard Improvements, Phase 2
|
||||||||
| LOCATION |
The Boulevard is a series of streets and avenunes on the crown of Queen Anne
|
| BUDGET |
$250,000, includes planning, design, and construction.
|
| SCHEDULE |
Planning:complete
Design:complete
Construction:8/1/2009
Completion:11/1/2009
|
This project involves work at three locations on the boulevard, including:
1) on the north side of W. Fulton St, between 8th AVE W. and 9th AVE W: replace the sidewalk and driveways, improve the lawn planting strip, and prevent parking on the park; in the triangle at W. Fulton St and 8th AVE W: install irrigation.
2) in the triangle at W. Smith ST, 1st AVE W. and W. McGraw PL: add irrigation and landscaping.
3) at the triangle at 8th PL W & 7th AVE W: install irrigation and landscaping.
Public Meeting #1 09/19/06
Survey of Existing Conditions
- 8th Ave W - 2700 block(PDF)
- Bigelow Ave - 1100 block(PDF)
- Bigelow Ave - 1400 block(PDF)
- Bigelow Ave - 1500 block(PDF)
- Bigelow Ave - 1600 block(PDF)
- McGraw Pl - 2400 block(PDF)
- Smith St. and McGraw Place(PDF)
- W Fulton St - 800 block(PDF)
- West McGraw St and 7th Ave W(PDF)
- West McGraw Place - 2400 Block(PDF)
- West Raye St - 500 block(PDF)
- West Smith St and W McGraw Pl(PDF)
*Note:
To view a PDF, you must have Adobe Acrobat Reader. Download it for free at www.adobe.com.
There are no events planned at this time.
Pamela Alspaugh
800 Maynard Ave S
RDA Bldg, Suite 300
Seattle, WA 98134
(206) 684-7328
pamela.alspaugh@seattle.gov
| Parks Home | Parks | Centers & Pools | Activities | Reservations & Permits | Projects & Planning | About Us | Contact Us |