Highland Park Way SW Connection Project

Updated May 10, 2024

What's Happening Now?

Haga clic aquí para la versión en español

How can we design a better way for you to bike, walk, or roll?

Share your thoughts to improve the path along Highland Park Way SW! Learn about the project below and let us know what you think in one of these ways...

Map of the project area, which runs along Highland Park Way Southwest from Southwest Holden Street to West Marginal Way Southwest and the Duwamish River Trail. The map includes a photo of a person walking on the existing path along Highland Park Way Southwest

Upcoming events

Stop by our table and chat with our team! 

Highland Park Corner Store  
Run Club, Wine Tasting, & Food Truck 
Thursday, May 16 | 4 – 8 PM 
7789 Highland Park Wy SW 

West Seattle Bee Festival  
Saturday, May 18 | 12 – 4 PM 
Commons Park | Lanham Place | Neighborhood House 

South Seattle College Spring Fling
Wednesday, May 22 | 11 AM – 2 PM
South Seattle College | Brockey Student Center (JMB Rooms A and B)

Highland Park Action Coalition Meeting 
Wednesday, May 22 | 7 – 8 PM 
Zoom or In-Person | Email hpacchair@gmail.com to join  

Highland Park Corner Store  
Run Club, Wine Tasting, & Food Truck 
Thursday, May 23 | 4 – 8 PM 
7789 Highland Park Wy SW 

Stay in touch!

To stay informed about the project, please sign up for email updates.  

Project Overview

The Highland Park Way SW Connection project is intended to provide an improved path for people to walk, roll, and bike between the Highland Park and Riverview neighborhoods and the Duwamish River Trail. This project was identified as a priority in the Seattle Transportation Plan and through conversations with community groups such as the Highland Park Action Coalition and West Seattle Bike Connections

If you prefer, you can also watch a presentation describing this project and the different options we’re considering.  

Project Goals

  • Create a better option for people walking, rolling, biking, and taking transit in the area
  • Calm traffic along Highland Park Way SW to help increase safety and prevent collisions
  • Make a more comfortable connection to the Duwamish River Trail for people in Highland Park and nearby neighborhoods

Current Conditions

There is an existing path on the east side of Highland Park Way SW. It runs from SW Holden St to West Marginal Way SW with a section of grass serving as a landscape buffer between the path and the street. The path varies in width from 3.5 to 7 feet and the landscape buffer varies in width from 2.5 to 9.5 feet.  

The path needs repairs and is very close to the street in some places, making it less comfortable for people walking, rolling, and biking – particularly when people drive over the speed limit, which happens quite often in this area. Seattle Police collision reports and recent traffic data also indicate that people have driven off the street, crossed the centerline into oncoming traffic, sideswiped other vehicles, and even crashed into a person biking.

A person walking on the existing path along Highland Park Way SW. To the left of the path are two with two northbound driving lanes and two southbound driving lanes. There are cars driving in both directions.

Highland Park community member walking on the existing path along Highland Park Way SW. This section of the path just north of SW Holden St, where the path is about 6 feet wide, and the landscape buffer is about 2.5 feet wide.  

Illustration and Map of Current Conditions 

Street level diagram showing Highland Park Way Southwest. From left to right there is a route 131 bus stop, two southbound driving lanes, two northbound driving lanes, another route number 131 bus stop, and finally a landscape buffer with the existing pathway.

A map of Highland Park Way Southwest from Southwest Holden Street to West Marginal Way Southwest with an additional graphic below showing the zoomed in part of the project area at the intersection of Highland Park Way Southwest and West Marginal Way Southwest. In the map and the graphic, the existing path with a landscape buffer is shown, along with the location of the Duwamish River Trail and the location of the West Duwamish Greenbelt trailhead. The existing landscape buffer and path extend along Highland Park Way Southwest from Southwest Holden Street to West Marginal Way Southwest.

Proposed Improvements

To provide a better connection for people who walk, roll, bike, and take the bus between Highland Park and the Duwamish River Trail, we are exploring the following three options. 

All options remove the right northbound (downhill) driving lane, which will create space for an improved path, while also calming traffic. Narrowing streets reduces overall speeds, and our traffic analysis shows that a single northbound driving lane is sufficient for the number of vehicles traveling in this area.  

Option 1: Downhill Protected Bike Lane

For Option 1, we propose replacing the right northbound driving lane on Highland Park Way SW with a downhill protected bike lane. The bike lane would run parallel to the existing path and include a concrete barrier to divide the bike lane from traffic. At the intersection of Highland Park Way SW and West Marginal Way SW, we would add a diagonal bike crossing to connect people to the Duwamish River Trail (see the map below). We would also add lighting and make some repairs to the existing path to improve accessibility for people walking and rolling. 

Illustration and Map of Option 1: Downhill Protected Bike Lane 

Street level diagram showing Highland Park Way Southwest. From left to right, there is a route 131 bus stop, then two southbound driving lanes, one northbound driving lane, and a new concrete barrier with an opening for buses to pull in, as well as a new downhill bike lane. To the right of the bike lane is a route 131 bus stop and the existing landscape buffer and path with additional lighting and repairs.

A map of Highland Park Way Southwest that shows a new protected bike running from Southwest Holden Street to West Marginal Way Southwest with an additional graphic below showing the zoomed in part of the project area at the intersection of Highland Park Way Southwest and West Marginal Way Southwest. In the zoomed in graphic of the project area, the new downhill protected bike lane is highlighted as well as a new concrete barrier between the roadway and the bike path. There is an opening in the concrete barrier at the bus stop so buses can pull in and pick up passengers. The existing landscape buffer and path are also show. At the intersection, the bike lane rises to curb height so people biking can access a new diagonal crossing that leads to the Duwamish River Trail.

Key Points to Consider for Option 1 

  • Costs the least amount of money.

  • Takes the least amount of time to design and build.

  • Does not include a two-way bike lane. People biking down the hill will use the protected bike lane. People biking up the hill will share the existing path with people who are walking and rolling. 

  • Does not have concrete barriers for the sections of bike lane near bus stops. Buses will need to pull into the protected bike lane to pick up and drop off passengers. 

Option 2: Multi-use Path 

For Option 2, we propose replacing the existing path and the right northbound driving lane with a multi-use path. The multi-use path would include a wider landscape buffer and a wider path for people walking, rolling, and biking in both directions. This path will include bus stop landing pads in the landscape buffer, so people have a paved area to wait that is off the multi-use path. As in Option 1, we would add more lighting for people traveling along the path at night and add a diagonal bike crossing at the intersection of Highland Park Way SW and West Marginal Way SW to connect people to the Duwamish River Trail.  

Illustration and Map of Option 2: Multi-use Path  

Street level diagram showing Highland Park Way Southwest. From left to right, there is a route 131 bus stop, two southbound driving lanes, one northbound driving lane, and a new curb line. To the right of the curb line, there is a landscape buffer and a route 131 bus stop, and then a lighted multiuse path for people walking, rolling, or biking.

A map of Highland Park Way Southwest that shows a new multiuse path with a landscape buffer running from Southwest Holden Street to West Marginal Way Southwest with an additional graphic below showing the zoomed in part of the project area at the intersection of Highland Park Way Southwest and West Marginal Way Southwest. In the zoomed in graphic of the project area, the multiuse path with a landscape buffer is highlighted. At the intersection, the multiuse path ends and people can access existing crosswalks and a new diagonal bike crossing that leads to the Duwamish River Trail.

Key Points to Consider for Option 2 

  • Costs more money than Option 1.

  • Will take longer than Option 1 to design and build.

  • Provides the most travel options for people (e.g., two-way bike path, wider path for people walking and rolling).  

  • Provides a wider landscape buffer between driving lanes and people biking, walking, and rolling. 

  • Provides bus stop landing pads so people can wait for the bus without standing on the multiuse path.   

Option 3: Combination of Options 1 and 2

Option 3 is a combination of Options 1 and 2. In this approach, we would build the protected bike lane first – as it takes less time and less money to build – and then develop the new multi-use path later when additional funding is available.

Key Points to Consider for Option 3 

  • Costs the most money of the three options because of the phasing.  

  • Provides additional travel options sooner by building the protected bike lane and repairing the existing path first, and then providing more travel options later when we build the multi-use path.  

Other Options We Considered

Options 1 – 3 were informed by what we know about the area and by conversations with local community groups. We also considered a path on the west side of Highland Park Way SW, but opted for the east side since there is already an existing path. Plus, the west side of the street is more prone to landslides, and because the hill is quite steep, we predict a one-way uphill bike lane would get much less use. We believe concentrating our efforts on the east side will benefit the most people.  

Some people have asked why we did not consider widening the path into the green space instead of removing a driving lane. The answer is two-fold: 

  1. As mentioned above, our goals for this project are to improve safety and reduce vehicle speeds and collisions. Narrowing the street, calming traffic along Highland Park Way SW, and providing an improved dedicated space for people to bike, walk, and roll will help to achieve these goals.
  2. The green space to the east of the path is sloped and prone to landslides. This would mean we would need to build retaining walls and other stabilizing structures, which would increase the cost of the project significantly.  

All that said, we are still early in the design process, and we are open to exploring different options that are feasible and aligned with our goals

Community Engagement

In 2023, we met with community groups in the area, including the Highland Park Action Coalition and West Seattle Bike Connections. We also received input through the Seattle Transportation Plan, which identified this project as a priority. This spring, we are reaching out to community members and gathering additional input on the proposed options mentioned above through the following outreach activities:

  • Interviews with key community members
  • Mailer to community members near the project area
  • Door-to-door outreach to nearby businesses
  • Tabling and drop-in sessions at community events
  • Online and paper surveys 

Please share your thoughts in any of the following ways...

And don't forget to sign up for our email updates to stay informed!

Timeline

We are in the early stages of design and gathering community input on our initial concepts. This summer we will take what we’ve heard and develop our 30% designs. We will continue to engage community members throughout design and expect to build the project when funding for construction is available. 

Timeline illustration that shows the different phases of a project: Planning, which includes master plans and project development. Design, which includes early design and final design. And construction, which includes pre-construction, during construction, and wrap-up. The diagram shows that we are in early design.

Nearby Projects 

This project is adjacent to the Highland Parkway SW and SW Holden St Safety Improvements Project, where we have built new sidewalks, curb bulbs, and ADA accessible ramps, making this intersection safer and more accessible for people living, working, and traveling through the area.

Document Library

Project Fact Sheet (May 2024) 

Transportation

Greg Spotts, Director
Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104
Mailing Address: PO Box 34996, Seattle, WA, 98124-4996
Phone: (206) 684-7623