Filter Results

176 to 200 of 1979
southdowntownfinaleis
are identified. To maintain freight mobility over the long-term, the City and other agencies should also continue ...
0.00199781149 |
a/88171
2012adoptedbudget_000
, neighborhood traffic control, and freight spot improvements. Council made several changes to the ...
0.00199694512 |
a/61927
2012adoptedbudget_002
); and Updating the 2007 Bicycle Master Plan, considering tools such as neighborhood greenways and cycle ...
0.00199694512 |
a/61929
bgtdrafteisjune2016
Master Plan that considers the Freight Mobility Strategic Action Plan, ...
0.00199669017 |
a/100424
draftsouthlakeunioneis
and Pedestrian System Based on a review of the Pedestrian Master Plan, several improvements could be ...
0.001996072 |
a/87686
oneseattleplandraftplan2024
institutions have worked with the City to develop Major Institution Master Plans. These ...
0.001995958 |
a/153504
oneseattleplandraftplan2024
institutions have worked with the City to develop Major Institution Master Plans. These ...
0.001995958 |
a/153629
2023-standard-specifications
coordinated with the 2023 Edition City of Seattle Standard Plans for Municipal Construction. The 2023 Standard ...
0.00199594884 |
a/140217
2011-2012proposedbudget
-scale freight mobility improvements. This revenue will also be used to complete the next Transit ...
0.00199589925 |
a/61885
2011-2012proposedbudgetfinal
. Additional funds are directed towards increasing the number of small-scale freight mobility improvements. This ...
0.00199578167 |
a/61886
final_sodo-actionagenda_2009-0518_lowres_edit
for many people in the region, and the City’s recent adoption of a Bicycle Master Plan calls attention to ...
0.00199539913 |
a/56490
2020_standard_specifications
on-line at the following URL:http://www.seattle.gov/utilities/construction-and-development/standard-specs-plans/amendments ...
0.00199535862 |
a/113678
proposed-city-of-seattle-2026-draft-standard-specifications
1-02.9(3) Bidder/Subcontractor List ........................................................................................................ ...
0.00199500355 |
a/174962
2024-2029 proposed cip
street paving and resurfacing; building new sidewalks and curb ramps; school safety improvements; implementation of the Bike, Pedestrian, ...
0.00199414813 |
a/147694
oneseattleplanmayorsplanappendices2025
Appendices V1 One Seattle Plan—Mayor’s Recommended Appendix 1 Transportation | Page A-21 Freight ...
0.0019936543 |
a/164094
pmp_appendices
Parkways9/19/20Ballard Salmon Bay ParkPlanning Commission9/24/15City HallFreight Master ...
0.00199286733 |
a/99134
2012adoptedbudget_001
control, and freight spot improvements. Council made several changes to the planned uses of these funds ...
0.00199282332 |
a/61928
2016proposedbudgetbook
and implementing a comprehensive, multi-modal transportation strategy for Seattle. The strategy will integrate and prioritize within the ...
0.00199267734 |
a/62627
2014standardspecifications
of Transportation, Seattle Parks and Recreation, Seattle City Light, and the Seattle Center. These Specifications have been coordinated ...
0.00199237955 |
a/113664
2014adoptedbudgetbook
million that had been allocated to implementing the Pedestrian Master Plan, but which the Seattle ...
0.001991985 |
a/62189
2017standardspecifications
Plans for Municipal Construction. The 2017 Standard Specifications apply whenever any public or private construction is ...
0.00199097279 |
a/113668
stp_part_i
mobility options while prioritizing safety, equity, affordability, and sustainability Freight Master ...
0.001990351 |
a/158168
prelimdrafteis-2013-11-07
prelimdrafteis-2013-11-07 Swedish Cherry Hill Medical Center Major Institution Master Plan ...
0.001990018 |
a/77558
2024-2029 adopted capital improvement program
improvements; implementation of the Bike, Pedestrian, Freight, and Transit Master Plans; ...
0.00198923284 |
a/153286
oneseattleplanappendicesdecember2025
| Page A-22 Figure A-11 Freight Assets One Seattle Plan—Mayor’s Recommended Appendix 1 ...
0.00198830641 |
a/176332