Filter Results

676 to 700 of 1939
transportation
-priority projects identified in the City's ITS Master Plan, in combination with grant match and local ITS ...
0.00182767236 |
a/60536
feesubtitlefinal
combined with a variance application. 2. Design Review The minimum fee for Administrative Design Review, Master ...
0.00182766677 |
a/96535
1-0summarydeis
Transportation Systems (ITS), to improve transit speed and reliability throughout the city. Implementing Actions Identified in the ...
0.001827604 |
a/87459
seattle-city-council-2015-work-program_adopted-version-(res-31571 ...
support and guidance on design.FREIGHT MASTER PLANReview the proposed Freight Master ...
0.00182752078 |
a/53344
vz_action_plan
– such as the Bike Master Plan, ADA Program, New Sidewalks, and Vision Zero – that amplify our efforts to ...
0.00182740414 |
a/156451
2024feesubtitle
is for an ACU only, or an ACU combined with a variance application. 2. Design Review The minimum fee for Administrative Design Review, ...
0.00182734174 |
a/163979
bsl_detail
Gathering Space Improve 208,195 714,000 50,000 - Full Time Equivalents Total 0.96 0.96 0.96 0.96 Utility Infrstr MP and Repairs The ...
0.00182732765 |
a/147713
sdot
and curb ramps; school safety improvements; implementation of the Bike, Pedestrian, and Transit Master ...
0.00182723394 |
a/63321
duwamishvalley-actionplan-spanish
Mobility Study (2017) este estudio es una respuesta a comentarios de la comunidad de Georgetown expresados durante el desarrollo del Seattle ...
0.001827152 |
a/90416
utilities_and_transportation
of people, goods, and services throughout the city. Program Summary In 2008, projects funded include the following: Bike ...
0.00182714709 |
a/61365
bsl_2324adopted_mid-biennium
Equivalents Total 0.96 0.96 0.96 0.96 Utility Infrstr MP and Repairs The purpose of the Utility Infrastructure Master ...
0.00182703929 |
a/153231
crownhillactionplanfinal2021
needed to establish a network of top quality, frequent transit services that meets the travel needs of most Seattle residents and workers. ...
0.00182699424 |
a/86647
crownhillurbanvillageactionplan
priorities needed to establish a network of top quality, frequent transit services that meets the travel needs of most Seattle residents and ...
0.00182699424 |
a/86654
sdot-vision-zero-toptobottomreview-fullreport
to direct $1 million in bicycle master plan implementation funds to upgrade lower-cost plastic traffic ...
0.00182691868 |
a/139131
seattle industrial deis ch 2 2021_12
locations from industrial zoning in Georgetown and South Park and convert them to mixed-use zoning to achieve neighborhood goals. Action ...
0.00182680169 |
a/87143
laketobayruleandreport(0)
these concept plans for major public realm design items can be assured that these elements are approvable through the ...
0.0018267933 |
a/106629
laketobayruleandreport
plans for major public realm design items can be assured that these elements are approvable through the ...
0.0018267933 |
a/106630
wsb infra final narrative_03192021_v3
transportation network for Figure 2: Average Daily Truck Volumes on Seattle Roadways Source: Seattle Freight ...
0.00182673289 |
a/101530
seattle industrial deis ch 5 appendices 2021_12
in industrial areas. The EIS will also include proposed Comprehensive Plan amendments that implement the Industry & ...
0.00182665524 |
a/87160
crownhillurbanvillageactionplan(0)
and amenities.Many plans work together to guide infrastructure investments in neighborhoods across Seattle, including in ...
0.00182640075 |
a/86653
stc_report_to_council_vers3
to neighborhood plans in Southeast Seattle.Climate Action Plan 2005 | 2013 Currently being updated to ...
0.00182633125 |
a/109277
impact-fee-rate-study_draft_january-2023
Master Plan; o Freight Master Plan; o Pedestrian ...
0.00182631251 |
a/138521
sdot
transportation options, the 2014 Proposed Budget makes important mobility investments, including funding to implement the Transit, ...
0.00182618853 |
a/62325
lpbcurrentnom_uw mechanical eng
of additional student housing (dormitories and married student housing). (Figure 8) • 1960 University of Washington Master ...
0.00182616548 |
a/74556
2010annualreport
, rehabilitation and seismic upgrades; tree pruning and planting; and other much-needed maintenance work. Funding also develops and ...
0.00182609656 |
a/99365