Filter Results

476 to 500 of 1942
seattle_cctmp04draftfullreport
delay. Demographic profiles from the City of Seattle’s Transit Master Plan, included in Appendix A, show ...
0.0018735287 |
a/99458
existing_conditions_report_20240209_final
Bicycle Master Plan ...
0.00187348539 |
a/154486
moveseatte-finaldraft-2-25-online
, is expiring in 2015. The city needs to renew the levy to continue basic programs and to expand the transportation system to meet ...
0.00187345257 |
a/99131
moveseatte-finaldraft-2-25-online
, is expiring in 2015. The city needs to renew the levy to continue basic programs and to expand the transportation system to meet ...
0.00187345257 |
a/99312
moveseatte-finaldraft-2-25-online(0)
, is expiring in 2015. The city needs to renew the levy to continue basic programs and to expand the transportation system to meet ...
0.00187345257 |
a/99311
lidi5economicfinancialfeasibilitymemorandum
through a master planning effort couldidentify clear opportunities to mitigate or reduce the cost of ...
0.001873128 |
a/87190
lfs-economic-financial-feasibility-memorandum
through a master planning effort couldidentify clear opportunities to mitigate or reduce the cost of ...
0.001873128 |
a/135023
2018_2022_pmp_implemplan_v13
-approved Levy to Move Seattle. Updated in 2017, the PMP is one of four modal master plans funded by the ...
0.001872665 |
a/99322
northrainierneighborhoodplantowncenteroutreach2012-05-31
, and people of all abilities, as well as freight and motor vehicle drivers.” Ordinance #122386 April 30, 2007 PEDESTRIAN ...
0.001872307 |
a/87305
fapreportchapter6
. (Programs and policies to support city-wide freight mobility between now and 2035 will be addressed in the ...
0.00187218329 |
a/101671
transportation_project_detail
in the City's Intelligent Transportation System (ITS) Strategic Plan and ITS Master Plan, ...
0.001872069 |
a/60927
transportation_detail
Date:End Date:This program implements the Seattle Bicycle Master Plan. Work includes installing bike ...
0.001871557 |
a/61534
sdot_project_detail
Program-284-TransportationStart Date:End Date:This project provides funding for high-priority projects identified in the City's Intelligent ...
0.00187145139 |
a/60975
transportation_projects
Program-253-TransportationStart Date:End Date:This program implements the Seattle Bicycle Master Plan. ...
0.00187113218 |
a/61481
sfab february 2022 minutes approved
, weekly, within the manufacturing and industrial centers. We looked at drafting this freight lane policy that builds on ...
0.00187079 |
a/131633
2020annual_report_1221_2020_final
Way – Discrete project, refer to page 56 30 Freight spot improvements 6 5 5 5 5 5 26 For more detail on program ...
0.00187041273 |
a/99548
financial-statements-federal-single-audit-2010
of Major Programs: The following were major programs during the period under audit: CFDA No. Program Title 20.507 ARRA - Federal ...
0.00187022286 |
a/58370
financial-audit-2010
transportation infrastructure; improve public safety; implement elements of the City’s Transportation Strategic Plan and ...
0.00187022286 |
a/58379
sdot_2530proposedcip
and resurfacing; building new curb ramps; school safety improvements; implementation of the Bike, Pedestrian, Freight, and ...
0.00187013834 |
a/160792
pres_cac_spu-revisions_22-09-21.reduced
INSTITUTION MASTER PLAN SEPTEMBER 21, 2022 CAC Meeting #21Seattle Pacific University - Draft Major ...
0.00186997978 |
a/134318
bmp_imp_plan_2021_final
that better integrate the modal priorities and plans, including the Pedestrian, Transit, Bicycle, and ...
0.00186992669 |
a/100036
2022_annual-levy-report_final
of neighborhood greenways (NGWs), completing over half of the Bicycle Master Plan citywide network. Of the ...
0.001869661 |
a/140586
2024floodplainreglationssepachecklist
in the Freight Master Plan that connects the city’s manufacturing/industrial centers, ...
0.001868411 |
a/158928
sfab january 2022 minutes approved
Illustrated and lack of guidance regarding freight vehicles. Freight Master ...
0.0018682353 |
a/131632
ne_130th_st_shoreline_multimodal access study
members during project outreach• Aligns with City of Seattle’s modal plans (Bicycle, Pedestrian, Freight, ...
0.00186801306 |
a/99133