Pyramid Peak at Skagit Hydroelectric Project, Photo by Jim Hunter
Seattle City Light JIM BAGGS, Interim General Manager and CEO
Standards Publications
MY ACCOUNT
Pay My Bill   

Construction Standards

Year Revised:



Title:

 

Standard
Number
Title Effective
Date
0072.01 Wildlife Protection, Small Birds and Animals - 0072.01 07/07/2016
0093.02 Utility Pole Attachments - 0093.02 09/01/2017
0093.06 Communications Bracket Installation - 0093.06 09/16/2015
0094.01 Communication Enclosures on SCL Wood Poles - 0094.01 03/23/2017
0095.05 Pole Attachments, Automated Meter Reading and Cellular Phone Antennas - 0095.05 05/30/2017
0095.10 Pole Attachments, AMI Antennas - 0095.10 12/07/2017
0095.17 Pole Attachments, AMI and AMR Wireless Units - 0095.17 11/06/2017
0095.30 Requirements for Strand-Mounted Wi-Fi - 0095.30 09/05/2017
0100.07 Wood Pole Installation - 0100.07 08/25/2017
0100.11 LR Bracket Installation - 0100.11 07/27/2016
0100.21 Single-Phase Overhead Jumpers, Unfused - 0100.21 01/23/2017
0100.23 Three-Phase Overhead Jumpers, Unfused - 0100.23 01/23/2017
0100.25 Overhead Jumpers, Fused Cutout - 0100.25 12/18/2017
0101.01 Single-Phase Tangent Pole Top Assembly for View Areas - 0101.01 03/23/2017
0101.03 Single-Phase Angle Pole Top Assembly for View Areas - 0101.03 03/23/2017
0101.05 Single-Phase Deadend Pole Top Assemblies for View Areas - 0101.05 03/23/2017
0103.01 Three-Phase Tangent Pole Top Assembly for View Areas - 0103.01 03/23/2017
0103.03 Three-Phase Angle Pole Top Assembly for View Areas - 0103.03 03/23/2017
0103.05 Three-Phase Deadend Pole Top Assemblies for View Areas - 0103.05 03/23/2017
0104.01 Three-Phase Armless Tangent Pole Top Assemblies - 0104.01 12/18/2014
0104.03 Three-Phase Armless Angle Pole Top Assemblies - 0104.03 05/11/2016
0104.05 Three-Phase Armless Deadend Pole Top Assemblies - 0104.05 08/25/2017
0121.01 Single-Phase Tangent Pole Top Assembly - 0121.01 03/02/2017
0121.03 Single-Phase Angle Pole Top Assemblies - 0121.03 07/07/2016
0121.05 Single-Phase Dead End Pole Top Assemblies - 0121.05 07/27/2016
0123.01 Three-Phase Tangent Pole Top Assemblies - 0123.01 06/29/2015
0123.03 Three-Phase Angle Pole Top Assemblies - 0123.03 06/24/2015
0123.05 Three-Phase Deadend Pole Top Assemblies - 0123.05 08/25/2017
0123.13 Three-Phase Tangent and Angle Wing Arm Pole Top Assemblies - 0123.13 11/16/2017
0123.15 Three-Phase Deadend Wing Arm Pole Top Assemblies - 0123.15 03/23/2017
0123.21 Three-Phase Multi-Gain Tangent Pole Top Assemblies - 0123.21 12/22/2015
0123.23 Three-Phase Multi-Gain Angle Pole Top Assemblies - 0123.23 03/09/2016
0123.25 Three-Phase Multi-Gain Deadend Pole Top Assemblies - 0123.25 10/26/2016
0125.01 Overhead Single-Phase Transformer Installation - 0125.01 04/24/2017
0125.02 Overhead Open-Delta Transformer Bank Installation - 0125.02 09/15/2017
0125.03 Overhead Three-Phase Transformer Bank Installation - 0125.03 09/15/2017
0125.05 Overhead Primary Switch Installation - 0125.05 09/15/2017
0125.07 Scada-Mate Primary Switch, 600 A - 0125.07 06/21/2017
0126.01 Primary Pole Terminations - 0126.01 11/06/2017
0126.04 Riser Extensions - 0126.04 11/16/2017
0127.01 Terminal Pole with Primary Switch - 0127.01 07/19/2017
0127.03 Terminal Pole with Fused Cutouts - 0127.03 11/06/2017
0214.00 Clearances between SCL Underground Structures and Other Utility Structures in the Public Right-of-Way - 0214.00 12/27/2016
0222.02 Requirements for Duct Banks in the Public Right-of-Way - 0222.02 11/09/2017
0224.01 Customer Requirements for Underground Secondary Service, Looped Radial System - 0224.01 07/19/2017
0224.05 Requirements for Underground Services on Private Property - 0224.05 11/09/2017
0224.07 Requirements for Secondary Conduits in the Right-of-Way - 0224.07 11/09/2017
0224.34 Steel Conduit Risers - 0224.34 11/09/2017
0226.06 Installation of Fluidized Thermal Backfill - 0226.06 03/19/2015
0226.11 Backfill Operations, General Requirements - 0226.11 07/28/2015
0231.01 Secondary Handhole Installation - 0231.01 04/20/2017
0231.03 Cast-in-Place Risers - 0231.03 08/04/2017
0232.05 Underground Residential Equipment Location of 577 Vaults and Secondary Handholes - 0232.05 06/19/2014
0233.05 Secondary Handhole Grounding - 0233.05 10/21/2015
0257.06 Ceiling Channel for In-Building Vaults - 0257.06 10/06/2017
0451.01 Grounding Electrodes for Distribution Poles - 0451.01 08/24/2015
0461.10 Grounding Electrodes for Handholes and Vaults - 0461.10 12/01/2014
0462.10 Grounding Electrodes for Overhead Ground Wire (OHGW) - 0462.10 08/15/2017
0468.90 Exothermic Connection System - 0468.90 09/10/2014
0473.50 Looped Radial and Network Service Entrance Cables in Conduit for Underground Primary Service - 0473.50 11/09/2017
0474.08 Looped Radial and Network Dry Vault Service Entrance Bus Duct for Underground Primary Service - 0474.08 11/09/2017
0535.21 Heat-Shrink Splices, Straight - 0535.21 02/03/2017
0652.01 Transformer Pad, Installation and Grounding, Single Phase, 25-167 kVA - 0652.01 11/09/2017
0652.03 Transformer Pad, Installation and Grounding, Three-Phase, 150-300 kVA - 0652.03 11/09/2017
0652.05 Transformer Pad, Installation and Grounding, Three-Phase, 500-1500 kVA - 0652.05 11/09/2017
0652.07 Transformer Pad, Installation and Grounding, Three Phase, 2000-2500 kVA - 0652.07 11/09/2017
0661.03 Padmount Transformer, Installation and Grounding, 3-Phase, 75-2500 kVA - 0661.03 06/24/2013
0674.06 In-Building Vault Lighting and Receptacle Requirements, Looped Radial System - 0674.06 06/23/2014
0735.50 Oil Containment Systems - 0735.50 12/09/2016
0751.00 Customer Requirements, In-Building Transformer Vaults, Network and Looped Radial Systems - 0751.00 11/09/2017
0751.49 In-Building Transformer Vault Doors - 0751.49 11/13/2017
0751.60 Concurrent Customer Requirements, In-Building Transformer Vaults - 0751.60 11/09/2017
0751.77 In-Building Vault Equipment Clearances - 0751.77 11/09/2017
0801.02 Switchgear, 27 kV, Padmount, Live-Front - 0801.02 01/02/2018
1252.10 FIRST HILL VACUUM SWITCH - 1252.10 07/28/2010
1561.05 Customer Requirements for Underground Residential Service Entrance, Single or Dual Meters - 1561.05 11/06/2017
1561.07 Customer Requirements for Underground Secondary Service Termination Facilities - 1561.07 11/09/2017
1561.09 Customer Requirements for Underground Secondary Service Termination Handholes in the Public Right-of-Way - 1561.09 12/19/2016
1562.05 PRIMARY METERING COMPARTMENT REQUIREMENTS, 27 kV - 1562.05 03/22/2011
1562.55 PRIMARY METERING COMPARTMENT REQUIREMENTS, 5 KV AND 15 KV - 1562.55 03/22/2011
1621.10 115 kV Tangent Pole Top Assemblies - 1621.10 08/15/2017
1621.20 115 kV Angle Pole Top Assemblies - 1621.20 08/15/2017
1621.30 115 kV Vertical Deadend Pole Top Assemblies - 1621.30 11/13/2017
1712.00 Streetlight Luminaire Installation on Wood Poles - 1712.00 04/25/2017
1713.12 Floodlight Installation, Single and Cluster-Mount on Wood Pole - 1713.12 01/18/2017
1714.10 STREETLIGHT CIRCUIT TAGGING AND IDENTIFICATION SYSTEM - 1714.10 08/06/2013
1714.50 Underground Streetlight Systems - 1714.50 07/07/2017
1716.07 Streetlight Handhole and Conduit Requirements - 1716.07 05/22/2015
1716.12 Streetlight, Precast, Concrete Foundation Installation - 1716.12 10/27/2015
1716.34 Requirements for Streetlight Pole Mounting and Grouting - 1716.34 10/27/2015
1716.38 Streetlight Poles, Chief Seattle, Foundation, Base, and Collar Installation - 1716.38 07/26/2016
1730.00 Streetlight Fusing Schedule, Individual - 1730.00 11/14/2014
1810.05 SHARED STREETLIGHT AND TRAFFIC CONTROL HANDHOLES - 1810.05 03/21/2016
D10-11 COPPER WIRE SIZES FOR DISTRIBUTION TRANSFORMERS SECONDARY CONNECTIONS - D10-11 10/23/2002
D10-3.3 Fused Cutout Mounting ΓÇô Contaminated Atmosphere - D10-3.3 06/07/2016
D10-5.1 15/26 kV Distribution Three-Phase Transformer Installation - D10-5.1 09/21/2016
D11-12 26 kV Automatic Line Sectionalizer Single-Phase Electronic Type Units On Tangent Construction - D11-12 06/07/2016
D11-13 26 kV Automatic Line Sectionalizer - D11-13 06/07/2016
D11-2 27 kV Fault Limiter Installation - D11-2 06/23/2004
D12-1 STREETLIGHT WIRING DIAGRAMS NOT FOR NEW CONSTRUCTION - D12-1 12/06/2002
D12-5.5 PHOTOELECTRIC CONTROL FOR 2400 VOLT UNDERGROUND STREETLIGHT SYSTEM CONTROL WIRING SCHEMATIC - D12-5.5 12/10/2001
D12-9/NSL-30 LUMINAIRE ALIGNMENT - D12-9/NSL-30 12/31/2000
D13-1 SECONDARY SERVICE DETAILS - D13-1 11/18/2005
D14-1 AMPACT TAP CHART - D14-1 12/28/2004
D14-3 Bare Conductors Mechanical and Electrical Properties - D14-3 09/30/2003
D14-4/NSV-20 BOLTED CONNECTION - D14-4/NSV-20 02/24/1999
D14-6 DISTRIBUTION LINE CONNECTIONS - D14-6 07/15/2003
D14-8/NSV-10 TOOL AND DIE CROSS-REFERENCE FOR CONNECTORS - D14-8/NSV-10 01/15/2003
D15-1 BIRD GUARD INSTALLATION - D15-1 03/17/2000
D15-2.1 HAND WRAPPED TIES SINGLE PIN TYPE INSULATOR FOR COPPER OR ALUMINUM POLY COVERED CONDUCTORS - D15-2.1 02/05/2001
D15-2.2 HAND WRAPPED SPOOL TIES FOR COPPER OR ALUMINUM POLY COVERED CONDUCTORS SINGLE TIE - D15-2.2 02/05/2001
D15-2.3 INSTALLING SINGLE HOT TIE ON SINGLE INSULATOR FOR COPPER OR ALUMINUM CONDUCTORS - D15-2.3 02/05/2001
D15-2.4 INSTALLING DOUBLE HOT TIE ON SINGLE INSULATOR FOR COPPER OR ALUMINUM CONDUCTORS - D15-2.4 02/05/2001
D15-2.6 ANGLE TIE ON SINGLE INSULATOR AND SINGLE SIDE TIE ON HORIZONTAL INSULATOR FOR COPPER OR ALUMINUM CONDUCTOR FOR COPPER OR ALUMINUM CONDUCTORS - D15-2.6 02/05/2001
D2-1 Standard Spacing of Arms - D2-1 12/10/2001
D2-1.2 Antenna Pole Attachments Above Primary Conductors - D2-1.2 06/02/2016
D2-3 CLEARANCES FROM STRUCTURES AND GROUND - D2-3 04/06/2016
D4-4 BRACES - D4-4 07/28/2005
D6-4 GUYING AND ANCHORING - D6-4 12/15/2003
D7-1 115 KV TRANSMISSION CONSTRUCTION (HORIZONTAL LINE POST) - D7-1 02/08/1999
D7-2 TOWER SIGN INSTALLATION - D7-2 08/18/2000
D7-3 115 KV TRANSMISSION, 50-ft STEEL POLE FOR CEDAR FALLS LINE TO REPLACE 15 METER CONCRETE, OR 50-ft AND 55-ft WOOD POLES - D7-3 06/04/2001
D8-10 TYPICAL NUMBER BOARD INSTALLATION - D8-10 02/05/2004
D8-12 26 kV, 3-Pole Gang Operated Air Break Switch, Unitized - D8-12 07/03/2009
D8-14 TYPICAL 26 KV SWITCH TERMINATION ASSEMBLY - D8-14 06/04/2001
D8-20 26/34.5 kV Vertical Switch, 1200 A, 3 Pole, Gang Operated, for Wood Pole Mounting, 1200 A Cable Termination Industry Standards - D8-20 10/19/2015
D8-26 26 kV CIRCUIT BREAKER - D8-26 06/19/2003
D9-11.6 4/0 PARALLEL CABLE - D9-11.6 12/18/1998
D9-20 DOUBLE CIRCUIT 4 KV SWITCH INSTALLATION - D9-20 03/17/2000
D9-21 4 KV SWITCH INSTALLATION - D9-21 03/17/2000
D9-60 15/26 kV Distribution Single Phase Corner Construction - D9-60 06/07/2016
D9-67.1 15/26 KV DISTRIBUTION CORNER POLE DETAILS 3├ÿ BOTH WAYS - D9-67.1 06/25/2003
D9-80 TREE CLEARANCES - D9-80 09/10/2008
DU11-1 Fusing Schedule - DU11-1 06/02/2016
DU11-4 Cable Limiters, Distribution - DU11-4 11/03/2014
DU13-4/NMT-30 METER BASE ARRANGEMENTS - DU13-4/NMT-30 04/01/2004
DU2-0/NGE-10 RECOMMENDED TYPICAL STREET MARKING - DU2-0/NGE-10 01/11/2002
DU5-1/NSV-30 Joint Preparation For Bolted And Compression Joints With Copper And/Or Aluminum (Plus Steel To Copper) - DU5-1/NSV-30 10/23/2015
DU5-15.3 Pole Termination, 3├ÿ 26 kV Distribution - Metal Oxide Arrester, #1/0 28 kV XPL, 2/C and #8 Kerite - DU5-15.3 06/02/2016
DU5-15.31 Pole Termination, 3├╕ 26 kV Distribution Wing Arm Construction, Metal Oxide Arrester #1/0 28 kV XLP, 2/C and #8 Kerite - DU5-15.31 06/02/2016
DU5-15.61 POLE TERMINATION, 3├ÿ 15/26 kV DISTRIBUTION, 350, 500, 750, AND 1000 KCMIL, 27 kV SHIELDED CABLE HIGH FAULT CURRENT AREAS - DU5-15.61 04/26/2006
DU5-15.62 Pole Termination, 3├ÿ, 1200 A, 2-750 kcmil, 1/C, or 2-1000 kcmil, 1/C Cables Per Phase - DU5-15.62 07/20/2015
DU5-15.8 SINGLE PHASE PRIMARY UNDERGROUND,15kV METAL OXIDE ARRESTER, #1 2/C, 27KV XLP CABLE - DU5-15.8 10/27/2004
DU5-18 POLE TERMINATION, 26 KV SINGLE PHASE UNDERGROUND SUPPLY TO OVERHEAD TRANSFORMER - DU5-18 02/24/1999
DU5-5 Pole Termination, 600 Volt Underground to Overhead 1. Notes - DU5-5 10/27/2014
E1-11 / NGE-20 FULL LOAD CURRENTS IN AMPERES SINGLE-PHASE CIRCUITS - E1-11 / NGE-20 11/25/1998
NCB-10 GROUNDING NETWORK SYSTEM DRY TRANSFORMER VAULTS, ALUMINUM BUS - NCB-10 09/16/2010
NCB-120 2000 AMP 600 VOLT ONE WAY AND TWO WAY SUBMERSIBLE CONNECTORS FOR ALUMINUM TO ALUMINUM AND ALUMINUM TO COPPER SECONDARY CABLES NETWORK AREA - NCB-120 09/04/2001
NCB-130 Network Protector Indicator Lights - NCB-130 04/07/2016
NCB-140 Fire Detection Installation Details and Wiring Diagram for Dry Vault - NCB-140 10/28/2015
NCB-141 Fire Detection Installation Details and Wiring Diagram for Wet Vaults - NCB-141 04/07/2016
NCB-150 Installation of Alley Wall Risers and Cans - NCB-150 08/19/2008
NCB-170 GROUNDING of PADMOUNT SPECIALTY & AUTOTRANSFORMERS - NCB-170 07/10/2001
NCB-180 Fire Detection System Retrofit Network Protector for Waterproofing - NCB-180 09/28/2000
NCB-20 GROUNDING NETWORK SYSTEM TRANSFORMER VAULTS WET, DRY, OR SPOT - COPPER BUS - NCB-20 04/10/2006
NCB-30 GROUNDING NETWORK SYSTEM, WET VAULT, NON-TRANSFORMER ONE OR TWO 48-INCH BUS BARS - NCB-30 02/01/2011
NCB-40 NETWORK SPOT OR SYSTEM MULTI-TRANSFORMER WET OR DRY VAULT INSULATED GROUND/NEUTRAL BUS INSTALLATION - NCB-40 11/18/2011
NCB-60 IWCB INSTALLATION AND MOUNTING PARTS - NCB-60 10/16/2010
NCB-70 TRAFFIC AND STREETLIGHT SERVICES IN NETWORK AREAS - NCB-70 04/19/2017
NCI-100 CABLE SUPPORT BRACKET WALL MOUNTED - NCI-100 10/17/2014
NCI-110 CABLE HANGERS - FOR NETWORK VAULTS MULTIPLE CONDUCTOR HANGER - NCI-110 03/17/1997
NCI-140 ARMORED CABLE SUPPORT FOR HIGH RISE BUILDINGS - NCI-140 12/31/2000
NCI-160 UNDERGROUND SECONDARY CABLE - TRAINING & RACKING - NCI-160 02/08/1999
NCI-180 CABLE END SEALING - NCI-180 04/20/2007
NCI-210 Cable Accessories for 1000 KCMIL, EPR, 15 kV Flat Strap Triplexed Network Cable 623670 - NCI-210 12/26/2013
NCI-62 Pulling Iron Installation for In-Building Vaults, Network System - NCI-62 08/30/2016
NCI-80 CABLE, EQUIPMENT AND FACILITY IDENTIFICATION - NCI-80 09/14/2007
NCI-91 SEALING CONDUITS - NCI-91 09/17/2013
NCI-99 LIGHT DUTY INSULATED SUPPORT ASSEMBLY NETWORK FACILITIES - NCI-99 10/02/2001
NDK-140 SQUARE TILE DUCT REBUILD - NDK-140 04/21/1999
NDK-150 Insulation Detail for City Light Duct Banks That Cross Steam Lines - NDK-150 02/10/2014
NSP-100 Three Conductor, 13.8 kV Straight Splice - Polyethylene Insulation - NSP-100 06/13/2001
NSP-100 THREE CONDUCTOR, 13.8 kV STRAIGHT SPLICE POLYETHYLENE INSULATION - NSP-100 06/13/2001
NSP-110 TRIFURCATION of THREE CONDUCTOR POLYETHYLENE CABLE, 13 & 28 KV WITH and WITHOUT NEUTRAL/GROUND WIRES - NSP-110 12/18/2008
NSP-115 THREE CONDUCTOR, 13.8KV PRIMARY SPLICE BELTS COMPACT SECTOR CABLES ONLY - NSP-115 07/10/2001
NSP-120 13.8 KV PRIMARY WYE SPLICE POLYETHYLENE INSULATION - NSP-120 09/29/1999
NSP-130 26-KV PRIMARY WYE SPLICE - POLYETHYLENE INSULATION - NSP-130 07/10/2001
NSP-140 13.8 KV END BELL, PAPER INSULATED, LEAD COVERED - NSP-140 05/23/2001
NSP-171 FLAT STRAP SHIELDING TERMINATION FOR USE IN DELTA NETWORK ONLY - NSP-171 05/01/2002
NSP-20 SPLICE - STRAIGHT TWO CONDUCTOR CONCENTRIC, 5000 VOLT POLYETHYLENE INSULATED COPPER CABLE - NSP-20 08/10/2001
NSP-200 SPLICE, WYE, THREE CONDUCTOR, 26 kV PAPER INSULATED, LEAD SHEATH - NSP-200 08/24/2001
NSP-210 SPLICE- STRAIGHT, THREE CONDUCTOR, 26 kV PAPER INSULATED, LEAD SHEATH - NSP-210 06/19/2001
NSP-220 TERMINATION POTHEAD, 25 KV SINGLE CONDUCTOR, PILC-PEJ - NSP-220 10/27/2004
NSP-250 TERMINATOR - 13 KV FOR INVERTED INSTALLATION - NSP-250 06/10/2001
NSP-270 TERMINATION OF 3/C XLP INSULATED, JACKETED CABLE USING PATR TERMINATORS, 15 kV OR 26 kV ROUND CONDUCTORS - NSP-270 07/20/2005
NSP-280 TERMINATION OF 3/C 15 KV XLP INSULATED, PVC JACKETED CABLE USING 600 A DEAD BREAK ELBOWS ON AIR INSULATED METALCLAD SWITCHGEAR - NSP-280 02/17/1999
NSP-30 SPLICE - STRAIGHT - 5000 VOLT, TWO CONDUCTOR CONCENTRIC, POLYETHYLENE INSULATED TO SINGLE CONDUCTOR - NSP-30 08/10/2001
NSP-320 DEADBREAK STRAIGHT LINE CONNECTOR 600 AMP, 13 KV and 26 KV - NSP-320 07/07/2014
NSP-321 25kV 600 AMP, Straight Receptacle Installation lnstructions - NSP-321 05/15/2003
NSP-350 GROUND CONNECTION FOR SPLICES IN NETWORK VAULTS AND MANHOLES - NSP-350 02/24/1999
NSP-60 TERMINATION, 2/C, 5 KV, CONCENTRIC POLYETHYLENE INSULATION - NSP-60 08/10/2001
NSP-80 SPLICE, WYE, THREE CONDUCTOR, 13 KV PAPER INSULATED, LEAD SHEATH - NSP-80 10/27/2004
NSP-90 SPLICE- STRAIGHT, THREE CONDUCTOR, 13 kV PAPER INSULATED, LEAD SHEATH - NSP-90 06/19/2001
NTP-120 HAZELTINE MODEL 2391 TRANSMITTER INSTALLATION TYPE O1 - NTP-120 07/28/2005
NTP-121 HAZELTINE MODEL 2800 TRANSMITTER INSTALLATION TYPE O2 - NTP-121 07/28/2005
NTP-122 HAZELTINE MODEL 2778 TRANSMITTER INSTALLATION TYPE O3 - NTP-122 08/29/2007
NTP-123 DIGITALGRID NCS TRANSMITTER INSTALLATION, NETWORK PROTECTORS - NTP-123 10/03/2007
NTP-130 BUS TIE SWITCH INSTALLATION - NTP-130 09/10/2008
NTP-41 SEISMIC ANCHORING FOR OIL FILLED SPECIALTY TRANSFORMERS - NTP-41 01/25/2000
NTP-60 Lighting and Sump Pump Installation for Single Transformer Vaults - NTP-60 11/13/2013
NTP-70 HIGH VOLTAGE SWITCHROOM & MULTI-TRANSFORMER NETWORK VAULT LIGHT and RECEPTACLE CIRCUITS - NTP-70 09/28/2000
NTP-80 Network Protector Fusing, Lead Sizes and Relays - NTP-80 07/28/2017
NTP-90 Cable Limiters - Network - NTP-90 11/03/2014
NVH-80 Network Area Requirements for Panel or Cast-in-place Vaults - NVH-80 04/13/2016
S128-1 WELDING AND CUTTING PRACTICES - S128-1 05/01/2002
S319-0/NSA-10 HAND SIGNALS FOR USE IN LINE CONSTRUCTION - S319-0/NSA-10 04/28/2002
S319-1/NSA-20 HAND SIGNALS FOR SHOVEL AND CRANE OPERATION - S319-1/NSA-20 05/01/2002
S319-2/NSA-30 SAFE WORKING LOAD FOR ROPES AND SLINGS - S319-2/NSA-30 05/01/2002
S403-1 SAFE POLE CLIMBING PRACTICES - S403-1 05/01/2002
U1-2.6 Mapping Symbols - U1-2.6 11/14/1983
U1-4.12/NCI-61 Pulling Cable Around Blocks - U1-4.12/NCI-61 07/08/1996
U1-4.15/NCI-20 GUIDE FOR HIGH DC VOLTAGE FIELD TESTING OF INSULATED POWER CABLE - U1-4.15/NCI-20 10/05/2011
U1-4.51/NTP-100 Transformer Secondary Lead Sizes for Underground Installations - U1-4.51/NTP-100 08/01/2007
U10-1.2 Transformer Pad, Commercial and Industrial Underground from Overhead - U10-1.2 12/30/2015
U10-1.4 PADMOUNT TRANSFORMER INSTALLATION, GROUNDING AND CONNECTIONS 240/120 V, 1├ÿ, 3W, 25 THROUGH 167 kVA - U10-1.4 12/03/2010
U10-5.2 Pad Construction for Pad-mounted Switchgear - U10-5.2 07/28/2015
U10-5.3/NTP-40 NETWORK TRANSFORMER ANCHOR BEAM FOR SEISMIC LOADING (EARTHQUAKE ANCHORS) - U10-5.3/NTP-40 11/08/2013
U10-5.5/NTP-50 VIBRATION DAMPERS NETWORK TYPE AND SINGLE PHASE TRANSFORMERS - U10-5.5/NTP-50 03/21/2000
U10-7 REQUIREMENTS FOR TRANSFORMER PADS AND EXTERNAL, BELOW-GRADE TRANSFORMER SERVICE VAULTS - U10-7 11/09/2017
U11-8 Commercial Subway Transformer 750 through 2500 kVA, Standard Installation - U11-8 08/15/2017
U11-9 NTP-110 TRANSFORMER AND NETWORK PROTECTOR SECONDARY BOLTING AND TAPING - U11-9 NTP-110 10/26/2016
U12-5/NMT-20 Meter Socket Connections and conductor Identification 200 Ampere Maximum - U12-5/NMT-20 07/10/2002
U13-1/NGE-50 ELECTRICAL INSULATING OIL SAMPLING AND TESTING FLAT GAP - U13-1/NGE-50 04/01/2005
U2-11.2/NDK-20 REINFORCEMENT OF CONCRETE ENCASED DUCT RUNS - U2-11.2/NDK-20 01/12/2011
U2-11.3/NDK-30 TERMINATION of EXISTING DUCTS in NEW VAULTS or MANHOLES - U2-11.3/NDK-30 12/04/1997
U2-11.40/NDK-40 Mandreling and Cleaning of Ducts and Conduits - U2-11.40/NDK-40 01/14/2016
U2-12.4/NVH-70 Sump Installation for Existing and Cast-in-Place Vaults or Manholes - U2-12.4/NVH-70 11/05/2003
U2-14.2 Vault Installation - U2-14.2 08/25/2017
U2-15.1 Installation of Ring Type Vaults - U2-15.1 07/19/2017
U2-16 VAULT, MANHOLE, HANDHOLE NUMBER IDENTIFICATION - U2-16 09/04/2001
U2-22 PRE-CAST PANEL VAULT INSTALLATION, GENERAL NON-NETWORK AREA - U2-22 10/20/2014
U2-6/NVH-20 INSPECTION AND REPAIR PROCEDURES FOR PRECAST VAULTS AND MANHOLES - U2-6/NVH-20 02/01/2008
U4-2.8/NCI-150 BENDING, TRAINING, AND RACKING UNDERGROUND SECONDARY CABLE (SERVICES AND/OR BUS TIES) - U4-2.8/NCI-150 02/12/1999
U4-3 NCI-170 BENDING, TRAINING, RACKING AND RE-REELING OF UNDERGROUND PRIMARY CABLE - U4-3 NCI-170 03/07/2017
U4-3.3 CABLE TAGGING AND PHASE MARKINGS - U4-3.3 09/14/2007
U4-3.5/NCI-130 CREEPAGE OF CABLE - U4-3.5/NCI-130 07/06/1999
U4-3.6/NCI-70 DUCT EDGE PROTECTION - U4-3.6/NCI-70 03/22/2002
U4-3.7/NCI-90 FIRE AND ELECTRIC ARC PROOFING OF CABLES - U4-3.7/NCI-90 03/02/2006
U4-5/NCB-50 INSTALLATION OF SECONDARY BUS BAR - U4-5/NCB-50 12/06/2013
U5-1.02_NCB-80 SPLICES AND TAPS, 600 VOLT, ALUMINUM TO ALUMINUM, ALUMINUM TO COPPER, COPPER TO COPPER - U5-1.02_NCB-80 10/29/2014
U5-1.03/NCB-100 Application Data For Heat-Shrinkable Splice Covers And Cable Caps - U5-1.03/NCB-100 11/03/2014
U5-1.10/NCB-110 SUBMERSIBLE MULTIPLE CONNECTOR INSTALLATION FOR ALUMINUM OR COPPER SECONDARY CABLE-TYPE USE - U5-1.10/NCB-110 11/18/2013
U5-14/NSP-310 600 AMPERE PRIMARY EQUIPMENT TERMINATION - U5-14/NSP-310 10/17/2014
U5-15.05 SEPARABLE CONNECTOR (ELBOW), 200 A, LOADBREAK - U5-15.05 01/25/2008
U5-16.05 SEPARABLE CONNECTOR (ELBOW), 200 A, DEADBREAK - U5-16.05 01/25/2008
U5-17.05/NSP-304 Separable Connector (T-Body), 125 kV BIL, Deadbreak - U5-17.05/NSP-304 12/23/2014
U5-17.10/NSP-305 SEPARABLE CONNECTOR (T-BODY), 150 kV BIL, DEADBREAK - U5-17.10/NSP-305 01/25/2008
U5-2.7 J BOX MOUNTING AND GROUNDING - U5-2.7 07/10/2001
U5-2.8.4/NSP-300 600 AMP PRIMARY CONNECTORS AND CABLE MOUNTING METHODS - U5-2.8.4/NSP-300 10/14/2016
U5-2.8.5 TERMINATOR ELBOW RECEPTACLE INSTALLATION #8 KERITE CABLE - U5-2.8.5 02/12/1999
U5-2.8.7 200 AMPERE ELBOW SEALING ON 1/0, 28 KV JACKETED CONCENTRIC NEUTRAL CABLE - U5-2.8.7 10/06/2006
U5-2.9 2000 AMP, 600 VOLT ONE WAY AND TWO WAY SUBMERSIBLE CONNECTORS FOR ALUM. TO ALUM. AND ALUM. TO COPPER SECONDARY CABLES - U5-2.9 09/04/2001
U5-26.20/NSP-285 TERMINATION, 200 kV BIL, COLD SHRINK - U5-26.20/NSP-285 12/11/2008
U5-3.20.1/NSP-170 SPLICE, STRAIGHT, 28 KV, XLP OR EPR INSULATED CABLE - U5-3.20.1/NSP-170 06/19/2001
U5-3.20.3 GROUNDING SPLICES ON 28 kV DRAIN WIRE-SHIELDED CABLE - U5-3.20.3 12/22/2005
U5-3.20.4 GROUNDING 3M COLD SHRINK SPLICES ON 28 kV FLAT STRAP CABLE - U5-3.20.4 05/23/2005
U5-3.22.1 JACKET SEALING WHEN SPLICING JACKETED 1/0 28 kV C.N. CABLE TO BARE 1/0 28 kV C.N. CABLE - U5-3.22.1 05/15/2008
U5-7 INTERCEPTING EXISTING UNDERGROUND SERVICE - U5-7 11/02/2001
U7-2/NDK-130 RIGID ALUMINUM CONDUIT - U7-2/NDK-130 01/16/2002
U9-5 577 VAULT TRANSFORMER AND JUNCTION BOX INSTALLATION, GROUNDING AND CONNECTIONS - U9-5 07/20/2010
U9-5.5 Three-Phase Loadbreak Vault, 612 and Larger - U9-5.5 03/01/2015
U9-6 577 VAULT WITH THREE LOADBREAK JUNCT ION BOX ES, INSTALLATION, GROUNDING AND CONNECTIONS - U9-6 10/30/2015
U9-7.3 Grounding and Connection Diagram, Single Phase 26 kV Distribution Transformer - U9-7.3 04/30/2014
U9-7.3 Grounding and Connection Diagram, Single Phase 26 kV Distribution Transformer - U9-7.3 12/06/2013
U9-7.5 Transformer Installation, Grounding and Connections 120/240 V and 240/480 V, 3-Phase, 4-Wire - U9-7.5 04/30/2014
U9-7.7 Transformer Installation, Grounding and Connections 208Y/120, 240Y/138, and 480Y/277 V, 3-Phase, 4-Wire Subtractive Polarity - U9-7.7 08/15/2017


Return to Top    Return to Home Page



  • Contact Seattle City Light

    700 5th Avenue
    Suite 3200
    P.O. Box 34023
    Seattle, WA 98124-4023


    Account & General Questions:


    Contact Us