Seattle Public Utilities Mami Hara, General Manager/CEO

South Park Water Quality Facility

Duwamish_Kayakers

This project will reduce flooding and improve water quality in the northern part of South Park.

Background

From the pump station, stormwater will be sent through the water quality facility, where it will be treated to remove a variety of pollutants that are common in urban stormwater runoff. The treated stormwater will then be released through the existing outfall to the Duwamish Waterway. This will result in cleaner water and a healthier Duwamish Waterway.

Project History

SPU originally decided to build a stormwater treatment facility in the 7th Ave S drainage basin because of the industrial nature of the lower (and northern) portion of the basin, and because the system drains into the Duwamish Waterway, which has poor water quality. Large-scale, centralized treatment of municipal stormwater is a new and emerging technology. At the time, SPU selected a treatment technology based on what was available and created a design for the combined water quality facility and pump station.

As more data became available about the performance and maintenance requirements of the treatment technology selected at the time, SPU decided to take another look at other available and more effective treatment technologies, including some emerging technologies. SPU is currently conducting an effort to test and finalize selection of a new treatment technology for the water quality facility.

Meetings & Events


There are no meetings scheduled at this time.

Connect


Shailee Sztern
Water Quality Facility project manager
Shailee.Sztern@seattle.gov
(206) 256-5256

Sheila Harrison
Line of business representative
Sheila.Harrison@seattle.gov
(206) 684-5899

Sign up for South Park project updates.