Specific Project Information Forms (SPIF)

Submit the following applicable Specific Project Information Forms with your JARPA to the Corps of Engineers

It is also strongly recommended that, as with other Corps-permitted projects or activities, you attend a City of Seattle pre-application meeting.
See calendar for meetings (pdf).

All forms are in Microsoft Word or Excel

Step 1:

Complete these required forms:

Step 2:

Complete the applicable construction or activity method forms:

Method 1: Delineation of Work Areas and Project Startup

Method 2: Clearing, Grubbing, Grading, & Placement of Temporary Fill

Method 3: Work Area Isolation and Fish Removal I Streams, Large Waterbodies and for Pipe Bypass

Method 4: Pipe, Culvert and Outfall Installation, Replacement and Maintenance

Method 5: Vactoring, Jetting, and Excavating Accumulated Sediments Sediments and Debris, Sediment Test Boring, and Pipe, Culvert and Bridge Maintenance

Method 6: Bank Stabilization

Method 7: Habitat Addition or Maintenance

Method 8: Beach Nourishment and Substrate Addition

Method 9: Boat Launch Improvement, Repair and Maintenance

Method 10: In-water and Overwater Structure Repair and Replacement

Method 11: Seawall Repair and Maintenance

Method 12: Site Restoration

Method 13: Landscaping and Planting

Step 3:

Submit these forms with the rest of your application package to the Corps of Engineers.