Specific Project Information Forms (SPIF)
Submit the following applicable Specific Project Information Forms with your JARPA to the Corps of Engineers
It is also strongly recommended that, as with other Corps-permitted projects or activities, you attend a City of Seattle pre-application meeting.
See calendar for meetings (pdf).
All forms are in Microsoft Word or Excel
Step 1:
Complete these required forms:
Step 2:
Complete the applicable construction or activity method forms:
Method 1: Delineation of Work Areas and Project Startup
Method 2: Clearing, Grubbing, Grading, & Placement of Temporary Fill
Method 3: Work Area Isolation and Fish Removal I Streams, Large Waterbodies and for Pipe Bypass
- 3A1: Temporary Bypass for Stream Flow: Partial Channel
- 3A2: Temporary Bypass for Stream Flow: Full Channel
- 3A3: Isolating Work Areas in Large Waterbodies
- 3B: Isolation/Bypassing of Piped Infrastructure
Method 4: Pipe, Culvert and Outfall Installation, Replacement and Maintenance
Method 5: Vactoring, Jetting, and Excavating Accumulated Sediments Sediments and Debris, Sediment Test Boring, and Pipe, Culvert and Bridge Maintenance
- 5A: Vactoring and Jetting
- 5B: In-water Excavating
- 5C: Sediment Test Boring
- 5D: Pipe, Culvert and Bridge Maintenance
Method 6: Bank Stabilization
- 6A: Demolish Bulkheads, Revetments, Groins
- 6B: Construct Sheet Pile Bulkhead
- 6C: Construct Cast-in-place Concrete Bulkhead
- 6D: Construct Log or Rock Toe
- 6E: Biotechnical Stabilization
- 6F: Repair Bulkheads
Method 7: Habitat Addition or Maintenance
Method 8: Beach Nourishment and Substrate Addition
- 8A: Beach Nourishment
- 8B: Substrate Addition
Method 9: Boat Launch Improvement, Repair and Maintenance
- 9A: Fill Prop Wash Holes
- 9B: Replace Ballast, Edge Armoring and Concrete Panels; Repair Concrete Panels
- 9C: Pressure Washing Boat Ramps
Method 10: In-water and Overwater Structure Repair and Replacement
- 10A: Piling
- 10B: Anchor and Chain Systems
- 10C: Superstructure, Decking and Utilities on Fixed Structures
- 10D: Floats and Gangways
- 10E: Floating Log Boom
- 10F: Buoys
- 10G: Fixed Breakwaters
- 10H: Highway or Road Bridge Foundation or Footing Repair
- 10I: Removal of Plants and Animals from Pilings for Inspection or Repair
Method 11: Seawall Repair and Maintenance
Method 12: Site Restoration
Method 13: Landscaping and Planting
Step 3:
Submit these forms with the rest of your application package to the Corps of Engineers.