Longfellow Natural Drainage

  • Established_NDS A natural drainage system project a few years after installation.
  • Installed_NDS A natural drainage system before plants are installed.

Timeline

  • 2017
    Outreach and conceptual design for potential blocks
  • 2018
    Design development
  • 2019 – 2020
    Anticipated construction

Connect


Jonathan Brown, project manager
Jonathan.Brown@seattle.gov
(206) 386-4027