Seattle.gov Home Page
Seattle.gov This Department

Projects

NEW TRANSFER STATIONS

The new state-of-the-art South Transfer Station is now open to all customers and replaces the former one to better serve residents and businesses with recycling, composting and garbage disposal for the next 50 years. Design of the new North Transfer Station has begun, and the design phase will wrap up in 2014.

New Transfer Stations

WATER SYSTEM PROJECTS

Some of the benefits from our water system projects include:

  • Improved seismic reliability
  • Improved water pressure
  • Increased water reliability
  • Increased water storage for fire protection
  • Improved the quality and security of our water supply
  • Extended the useful life of our facilities
  • Preserved the water quality
  • Maintained in-stream flows during drought conditions

Water System Projects

DRAINAGE SYSTEM PROJECTS

These sewer and drainage improvements will protect public health and safety by preventing sewer backups into people’s homes and businesses, as well as preventing street flooding. They will also help to protect our natural waterways from polluted stormwater runoff.

Drainage System Projects