Seattle.gov Home Page City Services Staff Directory [WEB GRAPHIC] About Seattle.gov City Contacts
Seattle.gov Home Page
 SEARCH: 
Seattle.gov This Department
SPU Home Page SPU Home Page Contact Us
Reliable water, sewer, drainage & solid-waste services
 

Sockeye Hatchery Home

Adaptive Management Plan  (PDF File)
Adaptive Management Plan Overview
Effects of the Hatcheries
Existing Hatchery Results
Hatchery Supplemental Environmental Impact Statement  (PDF File)
Goals and Concepts
Hatchery Program Contributors



About SPU > Water System > Habitat Conservation Plan--HCP > Sockeye Hatchery

Sockeye Hatchery

Sockeye eggs during incubation. At this stage the fish are embryos coiled within their protective egg shells. The arrow points to a dark spot that becomes the fish’s eye.



Seattle Public Utilities funds the operations of the Cedar River Sockeye Hatchery located near Landsburg Dam on the Cedar River. The hatchery is operated by the Washington Department of Fish and Wildlife. Sockeye produced at this facility contribute to the sockeye returns to the Cedar River and have made more frequent fisheries possible in Lake Washington.

The existing hatchery began operating in 1991 and is able to produce up to 17 million fry per year. These fry supplement the production from sockeye spawning naturally in the Cedar River below the dam. This hatchery produces fry to replace those that could have been produced above the dam, if sockeye were allowed to spawn there. In the interests of protecting drinking water quality, sockeye are not allowed to pass and spawn above Landsburg Dam.

A state of the art, replacement hatchery is planned that will increase production capacity to 34 million sockeye fry and provide improved facilities. Much work has been done by scientists and engineers to carefully design the new facilities. In addition, scientists have developed a monitoring program and an adaptive management plan that will improve our understanding of how this hatchery interacts with naturally spawning populations and will guide management decisions. Construction of the new facilities is expected to be complete in 2008.