Navigating the City of Seattle Permit Process
Coaching
Applications Requirements
Design Guidance
Survey and Base Map Requirements
Formal Review
Correction Cycles
Plan Approval
Utility Permits
2.10.1 Seattle Parks and Recreation Dept Reviews and Approvals 2.10.2 Non park Uses for Parks and Recreation Department Lands 2.10.3 Revocable Use Permits 2.10.4 Design Intent for Seattle Parks and Recreation Department Boulevard and Trails 2.10.5 Seattle Parks and Recreation Department Tree Policy and Permits 2.10.6 Seattle Parks and Recreation Department Standards 2.10.7 Department of Planning and Development Tree Policy and Permits 2.10.8 Street and Alley Vacation Process 2.10.9 Dedication of Street Rights-Of-Way or Easement 2.10.10 Shoreline Street Ends and Unimproved ROW 2.10.11 Coordination Activities 2.10.12 Landmark’s Certificate of Approval
Deviation Request Process for Street Right-of-Way
Environmental Review and Approvals
2.12.1 – City of Seattle Environmental Permits/Approvals 2.12.2 – Environmental Review as a part of the Permit Process 2.12.3 – Filling out the Environmental Checklist 2.12.4 – Transportation Impact Analysis
4.1.1 – Citywide Policy Guidance for Right-of-Way Improvements 4.1.1a – City of Seattle Comprehensive Plan 4.1.1b – Transportation Strategic Plan 4.1.1c – Comprehensive Drainage Plan 4.1.2 – City of Seattle Standard Plans and Specifications 4.1.3 – Washington State Minimum Design Standards
Street Classifications and Street Types
4.2.1 – Street Types 4.2.1a – Regional Connector Streets 4.2.1b – Commercial Connector Streets 4.2.1c – Local Connector Streets 4.2.1d – Main Streets 4.2.1e – Mixed Use Streets 4.2.1f – Industrial Access Streets 4.2.1g – Green Streets
Design Cross Section
4.17.1 – Links to Standard Plan and Specifications and other Resources 4.17.2 – Stormwater Code Compliance 4.17.3 – Stormwater Collection 4.17.4 -Drainage and Sewer Conveyance 4.17.5 – Side Sewers