5.14 Record Drawings

The City of Seattle is responsible for keeping records drawings on file as defined by the RCW Chapter 19.122. These drawings are kept in SPU's record vault. Before issuance of a Street Right-of-Way Improvement Permit, a signed copy of the approved plan set is forwarded to the record vault. If any changes are made to the plan during construction, an as-built drawing is prepared and sent to the SPU record vault to be incorporated into the permanent plan set. The public has access to these plans for future improvements and for maintenance activities


continue to section 5.15 »   
Latest Online Manual
Detailed Table of Contents
Chapter 5
Construction and Maintenance
5.1 Introduction
5.2 Pre-Construction Activities
5.3 Construction Inspection and Testing Procedures
5.4 Creating an Accessible and Safe Work Site
5.5 Traffic Control Requirements for In-Street Work
5.6 Locating Underground Utilities
5.7 Protection of Survey Monuments
5.8 Construction Stormwater Control
5.9 Demolition and Grading During Construction
5.10 Hazardous Materials Contamination
5.11 Excavation, Shoring, and Safety Systems During Construction
5.12 Street and Sidewalk Pavement Opening Restoration Rule
5.13 Acceptance/Warranty Procedures
5.14 Record Drawings
5.15 Annual Permits and Maintenance Responsibilities
5.16 Contact Information
   
Report ROWIM content errors and/or website problems Report ROWIM content errors and/or website problems
Download Adobe Acrobat Reader Download Adobe Acrobat Reader

 

End of Content
Home | Search Tips | Revisions | Join Email List | Glossary | Links | Contact Us | FAQs
SDOT Home | Seattle.Gov