5.12 Street and Sidewalk Pavement Opening Restoration Rule

The Pavement Opening and Restoration Rule (PORR) describes the requirements that applicants, contractors, and city crews shall meet when making or restoring openings within the street right-of-way.  The rule describes the extent and type of restoration required for different street classifications and pavement types.

Refer to a full copy of the  Rule, as it is the best source of information on this practice.


continue to section 5.13 »   
Latest Online Manual
Detailed Table of Contents
Chapter 5
Construction and Maintenance
5.1 Introduction
5.2 Pre-Construction Activities
5.3 Construction Inspection and Testing Procedures
5.4 Creating an Accessible and Safe Work Site
5.5 Traffic Control Requirements for In-Street Work
5.6 Locating Underground Utilities
5.7 Protection of Survey Monuments
5.8 Construction Stormwater Control
5.9 Demolition and Grading During Construction
5.10 Hazardous Materials Contamination
5.11 Excavation, Shoring, and Safety Systems During Construction
5.12 Street and Sidewalk Pavement Opening Restoration Rule
5.13 Acceptance/Warranty Procedures
5.14 Record Drawings
5.15 Annual Permits and Maintenance Responsibilities
5.16 Contact Information
   
Report ROWIM content errors and/or website problems Report ROWIM content errors and/or website problems
Download Adobe Acrobat Reader Download Adobe Acrobat Reader

 

End of Content
Home | Search Tips | Revisions | Join Email List | Glossary | Links | Contact Us | FAQs
SDOT Home | Seattle.Gov