title>Chapter 3: Right-of-Way Improvement Requirements
Working for a safe, affordable, vibrant, innovative, and interconnected city.
Learn More
Seattle.gov Home Page
Seattle.gov This Department
Skip Navigation to ContentSeattle Right-of-Way Improvement Manual SDOT Home
HomeSearch TipsRevisionsJoin Email ListGlossaryLinksContact UsFAQs
Chapter 3
  « Back to Chapter 2  |  Go to Chapter 4 »
Right-of-Way Improvement Requirements
3.1.2c New Streets, Street Improvement Requirements - Arterials
« Back to Previous Page

New arterial streets shall be fully improved to the design roadway width and pavement depth, with curbs, sidewalks, and street trees on both sides of the street, and drainage facilities.

Refer to Figure 3-14: Full Improvements for Newly Dedicated Streets  

Improvement required for new streets. Utilities and appurtenances needed to serve the new development, such as water, electricity, telephone, public sewer, public storm drain, streetlights, and fire hydrants shall be installed in conjunction with construction of the street improvements.

 
Latest Online Manual
Detailed Table of Contents
Chapter 3
Right-of-Way Improvement Requirements
3.1 Overview of Requirements from the Land Use Code (Ch. 23.53 & 23.22)
3.2 Requirements for Streets, Alleys and Easements
3.3 Contact Information
   
Report ROWIM content errors and/or website problems Report ROWIM content errors and/or website problems
Download Adobe Acrobat Reader Download Adobe Acrobat Reader

 

End of Content
Home | Search Tips | Revisions | Join Email List | Glossary | Links | Contact Us | FAQs
SDOT Home | Seattle.Gov