Departments
|
Services
|
Staff Directory
|
My.Seattle.Gov
Seattle.gov
This Department
Chapter 3
Chapter 3 Printable Documents
Chapter 3 - Print Version
Figures
3-All: All Figures from Chapter 3
« Back to Chapter 2
|
Go to Chapter 4 »
Right-of-Way Improvement Requirements
3.1.3d Alleys, New Alleys - Required Improvements
« Back to Previous Page
Required Improvements for New Alleys
Alley surface
: Portland cement concrete or asphalt concrete for the entire length and width of alley.
Turnaround:
Required when alley is not dedicated through from street to street.
Alley grading
: Grade to standard alley section for full width of alley.
Alley drainage
: Required.
Refer to
Figure 3-15: Alley Improvement
Select Chapters
1 Introduction
2 Procedures, Permitting Process...
3 Right-of-Way Improvement...
4 Design Criteria
5 Construction and Maintenance
6 Streetscape Design Guidelines
Detailed Table of Contents
Chapter 3
Right-of-Way Improvement Requirements
3.1
Overview of Requirements from the Land Use Code (Ch. 23.53 & 23.22)
3.2
Requirements for Streets, Alleys and Easements
3.3
Contact Information
Report ROWIM content errors and/or website problems
Download Adobe Acrobat Reader
Home
|
Search Tips
|
Revisions
|
Join Email List
|
Glossary
|
Links
|
Contact Us
|
FAQs
SDOT Home
|
Seattle.Gov