Working for a safe, affordable, vibrant, innovative, and interconnected city.
Learn More
Seattle.gov Home Page
Seattle.gov This Department
Skip Navigation to ContentSeattle Right-of-Way Improvement Manual SDOT Home
HomeSearch TipsRevisionsJoin Email ListGlossaryLinksContact UsFAQs
Chapter 3
  « Back to Chapter 2  |  Go to Chapter 4 »
Right-of-Way Improvement Requirements
3.1.3a Alleys, Existing Alleys - Required for Access
« Back to Previous Page

The Land Use Code requires the use of alleys for access in certain zones if the alley is already improved. The alley shall be considered improved for this purpose if it is paved to the width shown below:

Existing Right of Way and Pavement Widths for Alleys to be Considered to be Improved

Land Use Zone Category* Width of Alley**
SF, LDT, L1, L2, L3, NC1 10 feet
L4, MR, HR, NC2 12 feet
NC3, C1, C2, SM 16 feet

*When an alley abuts lots in more than one land use zone category, the zone category with the most frontage on that block along both sides of the alley, excluding SF and LDT zones, determines the minimum width. If the categories have equal frontage, the one with the greater width requirement shall be used to determine the minimum alley width.

** This width is solely for the purpose of determining if an alley must be used for access.

Right-of-Way and Pavement Width Requirements for Alleys Used for Access

Right-of-Way Improvement Requirements for Alleys Used for Access

 
Latest Online Manual
Detailed Table of Contents
Chapter 3
Right-of-Way Improvement Requirements
3.1 Overview of Requirements from the Land Use Code (Ch. 23.53 & 23.22)
3.2 Requirements for Streets, Alleys and Easements
3.3 Contact Information
   
Report ROWIM content errors and/or website problems Report ROWIM content errors and/or website problems
Download Adobe Acrobat Reader Download Adobe Acrobat Reader

 

End of Content
Home | Search Tips | Revisions | Join Email List | Glossary | Links | Contact Us | FAQs
SDOT Home | Seattle.Gov