Introduction
1.5 Departmental Roles and Responsibilities

The City of Seattle is made up of a number of departments. The following have a regulatory and permitting role with regard to the street right-of-way in Seattle:

Seattle Department of Transportation (SDOT) plans for, builds, maintains and operates Seattle's $8 billion transportation infrastructure. To further the goal to get Seattle moving, the department manages short- and long-term transportation investments that connect the City with the region. SDOT’s mission is to deliver a safe and reliable transportation system that enhances Seattle's environment and economic vitality. SDOT is responsible for building, operating and maintaining transportation facilities in the street right-of-way. SDOT also reviews and issues permits to manage the use of the street right-of-way, including permitting improvements to the street infrastructure constructed by developers and others agencies. City of Seattle Inspectors are responsible for enforcing the Ordinances; City Specifications; and the Street and Sidewalk Pavement Opening and Restoration Rules. This is to ensure that all construction, safety, and accessibility requirements of a permit are met as approved.

The Seattle Department of Planning and Development (DPD) develops, administers, and enforces standards for land use, design, construction, and housing within Seattle city limits. DPD is also responsible for long-range planning. With regard to the right of way, DPD reviews the scope of street improvements required of adjacent development. DPD also reviews and issues permits for new curbcuts, structural building overhangs,  commercial signs, and any shoreline substantial development permits when required for work in the street right-of-way. DPD also oversees the Design and Planning Commissions as well as the Design Review Board.

Seattle Public Utilities (SPU) provides more than 1.3 million customers in King County with a reliable water supply, as well as essential sewer, drainage, and solid waste services for the City of Seattle. To deliver these basic services, Seattle Public Utilities relies on a system of pipes, reservoirs, and disposal and recycling stations. In the street right-of-way, SPU is responsible for drainage facilities and conveyance systems, water facilities (e.g., hydrants) and solid waste services. SPU works with DPD and SDOT to provide water quality certification, water availability certification, side sewer and drainage permit application review and code compliance review.

Seattle City Light (SCL) works to sustain and enhance the community's quality of life by providing excellent energy services to customers and to be the most customer-focused, competitive, efficient, innovative, environmentally responsible utility in the United States. In addition to its generating facilities, SCL is also responsible for building, operating, and maintaining its power transmission and distribution facilities in the street right-of-way in a fashion that is both safe and reliable. SCL is also charged with the responsibility of managing the use of space on its facilities. Customers wanting new or enlarged electrical services or wishing to attach their equipment to SCL’s facilities must contact SCL and secure written permissions in advance.

Seattle Parks and Recreation (SPR) is responsible for development, maintenance and operation of over 6,200 acres of property including numerous historic parks, boulevards, open spaces, and recreation facilities. These include community centers, swimming/wading pools, play areas/courts and ball fields. Certain city streets have been officially designated as park boulevards. In addition to providing typical transportation and street right-of-way functions and amenities, park boulevards provide scenic links throughout the city. Any development project on or adjacent to a park boulevard must be reviewed and approved by SPR in addition to all other applicable review and approvals.

Seattle Fire Department responds to fire and medical emergencies, and is dependent upon the capability of the street network to handle traffic flows. The Fire Department reviews proposed street improvements, closures, etc. to identify potential negative impacts on response times. Private roads must be in accordance with Section 503 (Fire Apparatus Access Roads) and Appendix D of the Seattle Fire Code. Plans for building construction are routed from the Department of Planning and Development to the Fire Department's Fire Prevention Division for review of fire apparatus access and other fire code related issues.

Department of Neighborhoods (DON) Historic Preservation Program oversees Seattle’s historic preservation program. The program's primary objectives are to encourage the rehabilitation and reuse of historic properties for public and private use; to promote the recognition, protection and enhancement of landmark buildings, objects and sites of historic, architectural and cultural significance in Seattle; and, to identify, protect, preserve and perpetuate the cultural, economic, historical and architectural qualities of historic landmarks and districts throughout the city.


continue to section 1.6 »   
Latest Online Manual
Detailed Table of Contents
Chapter 1
Introduction
1.1 Purpose and Need
1.2 Authority
1.3 Organization
1.4 Relationship to Other Standards and Guidelines
1.5 Departmental Roles and Responsibilities
1.6 Contact Information
   
Report ROWIM content errors and/or website problems Report ROWIM content errors and/or website problems
Download Adobe Acrobat Reader Download Adobe Acrobat Reader

 

End of Content
Home | Search Tips | Revisions | Join Email List | Glossary | Links | Contact Us | FAQs
SDOT Home | Seattle.Gov