6/2/2009 Work is scheduled to begin on Monday, June 8th, depending on weather. There will be parking restrictions along the project boundaries as needed. The contractor will put up no parking signs on the affected block(s) 3 days before construction begins on that block. |
This project will include sidewalks & planter strips on both sides of 43rd Ave S. The planter strip will be a bioinfiltration swale in order to meet drainage code requirements. The street will be 25’ wide, which will allow parallel parking on both sides of the street.
|