SDOT Alaskan Way Viaduct Home
City of Seattle Alaskan Way Viaduct
Alaskan Way Viaduct and Seawall Replacement Project (WSDOT)
Contracting Opportunities
Emergency Traffic Management and Closure Plan
U.S. Army Corps of Engineers
Alaskan Way Viaduct Freight Mobility
Alaskan Way Seawall
Urban Mobility Plan

Contracting Opportunities

Upcoming safety and mobility improvements will repair or replace over half of the Alaskan Way Viaduct.
The Washington State Department of Transportation and the City of Seattle are moving forward with safety and mobility projects in the north and south ends of the Alaskan Way Viaduct corridor. Crews began construction on the first project in 2007, and work on the other improvements continues through 2012.

We are committed to increasing participation of Disadvantaged Business Enterprises and Women and Minority Business Enterprises (DBE/WMBE) in contracts for the Alaskan Way Viaduct and Seawall Replacement Program. Join the mailing list to stay updated on information about contracting and equal opportunities.


Call for bids on the South Massachusetts Street to Railroad Way South Electrical Line Relocation
May 2008
Be prepared for the next Moving Forward project

The Federal Highway Administration, Washington State Department of Transportation (WSDOT), King County and the City of Seattleare preparing for construction on the next Moving Forward project. They have recently advertised the contract for the South Massachusetts Street to Railroad Way South Electrical Line Relocation Project, which will move electrical lines that are currently attached to the Alaskan Way Viaduct. WSDOT established a voluntary goal of eight percent for participation of certified minority- and women-owned business enterprises (MWBEs) for this contract.

The bid package includes the following information and can be found on WSDOT’s Contract Ad and Award Web page:

  • Project costs
  • Construction schedule
  • Voluntary goal for MWBE participation level
  • Requirement for apprenticeship program

Work for this project includes:

  • Excavation, shoring, and backfill of trenches
  • Construction of medium and high voltage concrete-encased (FTB) electrical duct banks
  • Contaminated/unsuitable soil excavation and disposal
  • Electrical vault installation
  • Procurement and installation of medium and high voltage electrical cable, to include splicing
  • Transition splicing of high voltage electrical lines
  • Substation termination of high voltage electrical lines
  • Water line relocation
  • Drainage
  • Pavement and site restoration
  • Erosion and sedimentation control
  • Traffic control for in-street work

Did you miss the pre-advertisement meeting?

No need to worry – all the information and presentation materials are available on our Contracting and Equal Opportunity Web page.

Developing an equitable business environment

The State and City are committed to creating and sustaining an equitable business environment for the Alaskan Way Viaduct and Seawall Replacement Program. Our goal is to ensure a high level of DBE/WMBE participation by providing timely information and access to tools, resources and support services.

Construction of the Moving Forward projects will continue through 2012. Please see the “Projects” section on our Web site for more information. As construction ramps up, the State and City plan to conduct outreach activities to encourage the participation of disadvantaged and minority- and women-owned businesses.

Stay Connected

Visit:www.wsdot.wa.gov/projects/viaduct and click Contracting and Equal Opportunity on the left portion of your screen.

Join our mailing list: www.wsdot.wa.gov/projects/viaduct/contractingcontact.

E-mail:viaduct@wsdot.wa.gov

Call: 1-888-AWV-LINE

Write: Alaskan Way Viaduct and Seawall Replacement Project
c/o Washington State Department of Transportation
999 Third Ave, Suite 2424, Seattle, WA 98104