West Seattle Stadium Improvements Pro Parks Project Information
4432 35th Ave SW
Click to skip down to:
PROJECT STATUS
 |
EVENTS:
A dedication event is planned for spring 2007.
FOR MORE INFORMATION:
Joseph Neiford 800 Maynard Ave S. - 3rd Floor
Seattle, WA 98134 (206) 684-4119
|
January 2007
The resurfacing of the running track is nearly complete and is open for general public use for running. Spring 2007 track meets are scheduled as usual with both the track and the new field event facilities in use.
| LOCATION |
4432 35th Ave SW
|
| BUDGET |
The Pro Parks Levy provides $1,737,378 project costs for planning, design and construction.
|
| SCHEDULE |
Planning:2004 Design:2005-2006 Construction:Summer/Fall 2006 Completion:Spring 2007
|
|
| PROJECT DESCRIPTION |
Improve the track and field events with up to date surfaces and enclosures at the existing site. This will enable Parks to continue sponsoring organized track and field meets during the spring and summer months.
1. Track Upgrade – Renovate and resurface the track to remove surface irregularities (high spots, low spots, and soft spots) and provide a competitive new synthetic 400 meter track surface with 100 meter sprint run outs.
2. Field Events (track-related) – Install new synthetic surfacing of the existing turf field end areas (D-zones). Rebuild or install new field events on this synthetic all-weather surface. These include: long jump/triple jump, high jump, pole vault, shot out, discus, javelin and new steeplechase water pit obstacle. Associated equipment shall also be provided including new goal posts for the football field. |
|
|
| COMMUNITY PARTICIPATION |
|
Parks held one community on June 21, 2005 to present concept designs. No more public meetings are planned for this project.
|
| IMPORTANT LINKS |
|
|
< A-Z Projects List <
Acquisition < Development
< Project Map |
| |
| Updated
1/12/2007 09:11
|