South Washington Street Reliability Upgrade


Posting Date: 1/6/2017                

Contact: Percy Schlimm - Sr. Electrical Service Representative

Phone: (206) 386-1735

PROJECT UPDATE (2/27/2017)

This project was started on approximately 2/17/2017.

PROJECT OVERVIEW

Seattle City Light is taking steps to maintain the electrical reliability in the Pioneer Square area. Crews must excavate to replace underground electrical conduits (duct banks) and then pull in new electrical cable at vaults along South Washington Street. The work will start approximately one-half block east of First Avenue South and end at South Washington Street’s intersection with First Avenue South. The plan is to complete the work in three stages. All dates are approximate. View the maps for:

  • Stage 1 - here (mid-February to mid-March, weekdays)
  • Stage 2 - here (mid February to mid-March, weekends)
  • Stage 3 - here (mid-March to mid-late April, weekends)


PROJECT BENEFITS

• Improve the electrical infrastructure and reliability in the area.
• Proactively maintain the area’s electrical needs for future growth.

PROJECT IMPACTS

• No power outages are expected.
• Heavy equipment and trucks will be located at the worksite.
• Traffic, parking, and pedestrian impacts will occur near the worksite. See the maps on the back side.
• Excavated areas will be covered with steel plates during non-work hours.
• Weekend work will take place at the First Avenue South intersection. Lanes will be reduced and detours in effect.
• Crews will pull the electrical cable into the duct banks at a later date. That work involves crews working at vaults only, so it has a much smaller impact.

 


SCHEDULE

Construction Start: Approx. mid-February

Duration: Approx. two months

Daily Work Schedule: Mon - Fri, 9 a.m. - 3 p.m.; Sat, 9 a.m. - 6 p.m.
ALTERNATE CONTACT INFORMATION

Alternate Contact: -

Alternative Contact Phone:

Related Content

Streetlight Repair
Seattle City Light operates about 84,000 street lights throughout our service territory to help drivers and pedestrians stay safe at night.

Joint Use Engineering
Information on Joint Use, double poles & utility pole odors.

contact us

Contact Customer Service
206.684.3000
Or submit an inquiry online

Utility Discounts
SAVE 60%
The Utility Discount Program is a great way to lower bills.

LEARN MORE  


  • Contact Seattle City Light

    700 5th Avenue
    Suite 3200
    P.O. Box 34023
    Seattle, WA 98124-4023


    Account & General Questions:


    Contact Us