|
Central Waterfront Transmission Line Relocation Project Project Photos
The following photos are from Phase 1 of the project, which involved the relocation of transmission lines between Yesler Way and the Union Street substation. ![]() Crews install the new transmission line at the vault between Seneca and Spring streets. ![]() Crews complete restoration work at the Marion Street intersection. ![]() Crews unreel cable at the Union Street Substation. ![]() Crews work to bypass a water line on Western Avenue. ![]() Crews conduct dewatering activities in the vault between Spring and Seneca streets. ![]() Vactor trucks excavate pavement for the duct bank at University Street. ![]() Crews work to install the vaults between Yesler Way and Columbia Street ![]() Crews install conduit between Columbia Street and Marion Street. ![]() Crews lay down foundation as part of duct bank shoring. ![]() Duct bank shoring. ![]() Crews use a drill rig to install a dewatering system. ![]() Crews saw-cut the pavement before removing it to prepare to install duct bank. ![]() Crews will dig trenches where new utility lines will be installed. Vaults will be installed at various locations in the project area. |
More City of Seattle Construction Projects:
|