Planning updates for this neighborhood began in the fall of 2008. There were two community open houses in September (September 27 and September 30), the draft material for review and comment is posted below:
Places and Connections (Draft)
Othello Places and Connections Diagram
Built Environment Alternatives
Existing Land Use
Option 1: Core 85' Alternative (Draft)
Option 2: Expanded Core 85' Alternative (Draft)
Streetscapes (Draft)
DPD has hosted previous community events in March and May of 2009. Below are reports back from a number of community meetings.








